Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Shoreham, Vermont. Contact the soliciting agency for additional information.
The selected consultant(s) shall 1) demonstrate the ability to identify various hazard mitigation strategies that will eliminate or greatly reduce the impact of hazards that may affect the municipality and 2) have experience related to mitigation planning work. Funding Source: This work is funded by a Hazard Mitigation Assistance grant from FEMA. The selected consultant must be available and willing to complete the required work within 18 months of the date of the award of this contract, including FEMA approval. It is anticipated that the FEMA grant funds will cover all of the consultant expense, which will account for 75% of the entire project cost. The Town of Shoreham will be responsible for the remaining 25% of project cost, through a combination cash and in-kind hours. Tasks that will be undertaken by the Town of Shoreham staff and officials include: o General printing, photocopying, and other direct meeting expenses such as public notices. o Public outreach and publicity efforts. o Research (e.g. listers' data, flood levels and loss data). The consultant will assist the Town of Shoreham in tracking and helping to maximize in-kind hours towards the required match. The amount available for consultant expense is capped at $ 12,862.50. Cost-effectiveness and efficiency will be given very serious consideration. The selected consultant will be expected to propose a budget and timeline that makes the most cost-effective and expedient use of all in-kind resources, as well as other cost-saving measures, such as teleconferencing. Project Proposal The project proposal should be organized along the following steps (some discretion is allowed as long as the proposal is in line with the requirements of the FEMA Review Tool effective in 2023). Each step should indicate the consultant's role and responsibility, proposed date for completion, number of consultant hours required for each step, hourly rates and any associated direct expense. The Town of Shoreham brings to this project a willingness to align its resources in the most cost-effective manner possible, so consultants are strongly encouraged to suggest strategies for delegating responsibilities. Step Description 1. Assemble planning team and meet with consultant(s) to review the planning process and confirm outreach strategy. 2. Establish work plan with deliverables, timelines for completion and confirmed roles and responsibilities. 3. Review information on hazard history and future conditions utilizing best available data to determine priorities based on risk. 4. Design and initiate a public participation strategy for the jurisdiction to maximize meaningful public participation from stakeholder groups identified in the FEMA Local Mitigation Planning Policy Guidance. Request for public input is to occur during drafting stages of the plan, and when a draft is available, and may include outreach to local newspapers, surveys, meetings open to the public, posted fliers, or other alternatives. 5. Complete hazard assessment to determine vulnerability to each hazard and quantify the extent of each hazard. 6. Identify mitigation strategies to address vulnerabilities to each hazard. 7. Draft and submit plan to Vermont Emergency Management (VEM) and revise accordingly. 8. Submit plan to Vermont Emergency Management (VEM) and revise accordingly. 9. Adopt plan and return the final plan to VEM and FEMA. The final plan document developed by the consultant will be available to the Town of Shoreham in an accessible format (e.g. Word) to be used in future plan updates. This plan is funded through a FEMA planning grant under BRIC 2022. The Period of Performance (POP) for the grant funding this work is through 11/21/2026 and no expenses related to this project can be charged beyond this date. In limited circumstances, grant extensions may be feasible through VEM and will require contract amendments. 1. Consultant's qualifications and resume. Please include references and contact information for similar emergency management or hazard mitigation planning projects. 2. Description of experience with grant-funded projects, especially FEMA or Vermont Emergency Management programs. 3. Project and cost proposal, itemized by project steps as identified above. Proposal should include all consultant hourly rates and any associated direct expenses. Evaluation of Proposals: Selection of a consultant(s) will be based on the proposal and: o Documented experience in mitigation planning o Technical staff capability to assess risks based on identified hazards o Experience working with local, state, and/or federal government o Ability to recommend viable mitigation actions o References of past work in mitigation planning o Ability to coordinate the process with neighboring communities o Cost o Timeliness The Town of Shoreham encourages responses from disadvantaged, women-owned, minority-owned and small local firms. Selected candidates should be prepared to execute a contract that contains passthrough provisions regarding Federal programs and assurance related to this grant-funded work, including policies regarding conflicts of interest, equal opportunity, non-discrimination, retention of and access to records, and audit requirements, when applicable. The Town of Shoreham reserves the right to reject any or all responses. Please deliver responses and inquiries to: Laura Siebecker, Town Clerk Town of Shoreham 297 Main Street Shoreham, VT 05770 (802) 897-5841 shorehamtown@shorehamvt.us
Conceptual
Municipal
$12,862.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2025
Multiple Locations, Shoreham, VT
Related To This Project
Shoreham, VT
Bid Date: Dec 16 2021
Swanton, VT
Bid Date: Nov 08 2024
Swanton, VT
Bid Date: Nov 08 2024
Hartford, VT
Bid Date: Nov 06 2024
Middlesex, VT
Bid Date: Nov 18 2024
Middlesex, VT
Bid Date: Nov 18 2024
Middlesex, VT
Bid Date: Nov 18 2024
Middlesex, VT
Bid Date: Nov 18 2024
Middlebury, VT
Bid Date: Nov 14 2024
South Burlington, VT
--
South Burlington, VT
--
Middlesex, VT
Bid Date: Nov 18 2024
Charlotte, VT
Bid Date: Oct 22 2024
Middlesex, VT
Bid Date: Nov 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.