BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

Demolition, site work and new construction of a transportation facility in Fresno, California. Conceptual plans call for the construction of a 13,000-square-foot transportation facility.

new Air Traffic Control Tower and TRACON facility, including site preparation, utility extensions, equipment installation, parking lot reconstruction, and demolition of the existing tower, to modernize air traffic operations at Fresno Yosemite International Airport. As of October 20, 2025, this project is in the conceptual phase. Information regarding a timeline for construction has not been determined. -------------------------------------------------------------- Fresno Yosemite International Airport - Airport Traffic Control Tower Relocation Project Project Location: The Proposed Project is located on Airport property at 5055 East Andersen Avenue, Fresno, CA 93727. The existing Airport Traffic Control Tower (ATCT) is located on a 2.25-acre site northwest of the passenger terminal and adjacent to the Aircraft Rescue and Fire Fighting (ARFF) building. Site coordinates are 36 46' 24.34" N and 119 43' 19.00" W. The Assessor's Parcel Number (APN) is 494-071-78. Project Description: The City, as owner and operator of the Fresno Yosemite International Airport (FAT or Airport), proposes to replace the existing ATCT at the Airport. The existing ATCT includes the Terminal Radar Approach Control Facilities (TRACON), which would be relocated with the ATCT. The replacement ATCT would be constructed about 150-200 feet south of the existing ATCT. The existing ATCT would be demolished following construction of the replacement ATCT. The Proposed Project includes the following components: Construction of a new ATCT facility, including TRACON, with an estimated building footprint of 13,000 square feet (sq ft) and tower height of up to 190 feet. Installation of new equipment in the replacement ATCT. Extension of utility services to the replacement ATCT. Reconstruction of the existing parking lot to provide adequate parking for the replacement ATCT. Demolition of the existing ATCT facility, including TRACON. Who do I contact for more information For additional information, please contact Jon Bartel at Jon.Bartel@Fresno.gov. Contact Phillip Siegrist, Planning Manager via e-mail Phillip.Siegrist@Fresno.gov or by phone 559-621-8061 to request electronic copies or to schedule an appointment to view documents.

Conceptual

Transportation Terminals

$3,500,000.00

Public - City

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

5055 E Andersen Ave, Fresno, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.