Site work and renovation of a municipal facility in Woodbridge, New Jersey. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

As of 1/13/25, this project has not yet been awarded. A timeline for award has not yet been established. which involves the redevelopment of the Statewide Traffic Management Center (STMC) Site, including: the demolition of the former Highway Authority Administration Building, demolition of the Motor Pool Building (including multiple in-ground vehicle lifts), and construction of the Traffic Management Center Building Annex. Work also includes utility upgrades/retrofits (including construction of a new pad-mounted gas meter and water service freeze enclosure), penthouse equipment relocation to the new Annex Building and roofing upgrades at the existing STMC building to remain. A new fire pump is to be installed to replace the existing fire pump at the STMC building which will also service the new annex. Site improvements include reconstruction/reconfiguration of the existing parking lots with new lighting, expanded CCTV and electrical infrastructure for future EV charging stations. Site work also includes construction of a site retaining wall and drainage upgrades. The project requires multiple stages of construction to ensure the 24/7 services at the existing STMC remain operational at all times. The pre-bid site visit will be the only opportunity for the prospective Bidders to visit the site. During the pre-bid site visit a tour of the site will be conducted. No other site visits will be scheduled. Arrangements for the prospective Bidders to gain access to the site for the pre-bid site visit will be provided via e-mail to the prospective Bidders that register, as indicated above. The principal items of work include: Embankment, Common ...................................................................................................................12,066 C.Y. Foundation Excavation.....................................................................................................................3,261 C.Y. Demolition of Buildings (1)..............................................................................................................1 L.S. Site Electrical Work, Building No. 1 ...............................................................................................1 L.S. Building Electrical Work - Location No. 1.....................................................................................1 L.S. Building Mechanical Work - Location No. 1.................................................................................1 L.S. Building Architectural Work - Location No. 1..............................................................................1 L.S. Building Plumbing Work - Location No. 1 ...................................................................................1 L.S. Building Structural Work - Location No. 1 ...................................................................................1 L.S. Lead and Asbestos Survey, Report, Removal and Monitoring (NO-BID).................................500,000 USD Nothing discussed or presented at the pre-bid site visit shall be considered part of the Contract. All requests for interpretation or correction must be submitted in accordance with Subsection 102.05. The Bidders are advised that the Proposal Bond form or the Letter of Surety form provided in the Authority's Electronic Bidding software must be executed by the Bidder when this type of proposal guaranty is selected by the Bidder.

Bid Results

Municipal

$20,993,000.00

Public - State/Provincial

Renovation, Site Work

224

24

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Flagpoles, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furnishing Accessories, Bowls, Rugs and Mats, Floor Mats, Furniture, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Central Cooling Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Air Coils
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Emergency Lighting, Exterior Lighting, Roadway Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Soil Stabilization, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
255
Bidding Soon
4,812
All Active Projects
1,954
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

February 10, 2025

img_map_placeholder

Multiple Locations, Woodbridge, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.