BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a transportation facility in Winston Salem, North Carolina. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

All Contractors are hereby notified that they shall have proper Contractor's licenses as required by the state laws governing their respective trade in the state where this Project is located. Contractor shall meet the following bidding requirements: x Contractors must be listed on the NCDOT Prequalified list as a bidder or Prime to bid on this project. x Contractors, including subcontractors, must have a NC Contracting License pertaining to their discipline of work. x Contractors, including subcontractors, must be prequalified by the NCDOT to perform the work pertaining to their specific scope of work in the contract. The prime contractor for the project must be prequalified by the NCDOT as a prime. x Work codes for this project include, but are not limited to: 000801 CONSTRUCTION SURVEYING, 001660 SEEDING AND MULCHING, 008060 AIRFIELD LIGHTING, SIGNAGE AND NAVIATION AIDS. x Work code 00099 OTHER will not be accepted unless otherwise approved by the NCDOT or NCDOA that the work associated with that work code description for the contractor matches the work for the project. Bid security in the form of a bid bond equal to 5% of the total amount bid is required. Contract security in the form of 100% Performance and Payment Bonds will be required. Notice is hereby given that the bid documents for this project contain a provision for participation by Disadvantaged Business Enterprise (DBE). This project has a goal of 4% DBE of the total dollar value of the contract to be performed by DBE subcontractors. $1,000.00 per day for each calendar day that any work remains uncompleted after the contract time expires in its entirety. For work involving runway closures, liquidated damages of $500.00 per hour shall be assessed for each hour the runway remains closed beyond the defined closure timeframe. The maximum construction time allowed for the Project set forth in the contract documents as 49 consecutive weeks or 343 consecutive calendar days, including weather days as allowed per NCDOT Guidance. The Smith Reynolds Airport and Forsyth County reserves the right to waive any informalities or irregularities in or reject any or all bids and to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interest.

Post-Bid

Transportation Terminals

$2,000,000.00

Public - County

Outdoor Lighting, Site Work

112

9

24

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
39
Bidding Soon
1,091
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

January 20, 2025

img_map_placeholder

3801 N Liberty St, Winston Salem, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.