Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 20, 2024 at 7:00 PM
Updated December 21, 2024
Demolition, site work, paving and new construction of a civil project in Quilcene, Washington. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
Big Quilcene River Bridge package. Replacement Project, Floodplain Phase Dates of publication in the Seattle Daily Journal of Commerce, October 22 and 29, 2024 The Floodplain Phase of the Lower Big Quilcene Bridge Replacement Project includes; 1) 10/29(432738) realignment of 4,591 feet of the Lower Big Quilcene River back into its historic channel location, 2) the construction of 2.262 feet of new river side channels, 3) the regrading and restoration of 800 feet of the existing Big Quilcene River channel, 4) the construction of 684 feet of a new south setback levee. 5) the removal of 765 feet of the existing Rodgers Street, 6) the removal of 928 feet of the existing Fremont Avenue, 7) the removal of the existing. south levee from Rodgers Street west, 8) the removal of 1.861 feet of the existing north levee, 9) the removal of concrete walls. and the regrading of the south shoreline of the new river channel at Station 0+00, 10) the construction of a new road and bridge to access the Bonneville Power towers, and 11) the construction of scour pads around existing BPA power poles Estimated Project Minority and Women's Business Enterprises (MWBE) are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers.
Bid Results
Bridges / Tunnels
$7,363,999.00
Public - Federal
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2024
February 19, 2025
Fremont Ave & Linger Longer Rd, Quilcene, WA
Related To This Project
Quilcene, WA
Bid Date: Dec 20 2024
Quilcene, WA
Bid Date: Jan 10 2025
Quilcene, WA
Bid Date: Mar 05 2025
Quilcene, WA
Bid Date: Mar 05 2025
Quilcene, WA
Bid Date: Aug 28 2025
Quilcene, WA
Bid Date: Dec 03 2025
Quilcene, WA
Bid Date: Jan 17 2024
Quilcene, WA
Bid Date: Feb 01 2024
Quilcene, WA
Bid Date: Jan 31 2024
Quilcene, WA
Bid Date: Mar 30 2021
Quilcene, WA
Bid Date: Feb 11 2022
Quilcene, WA
--
Quilcene, WA
Bid Date: Mar 06 2023
Quilcene, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
