BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Quilcene, Washington. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Big Quilcene River Bridge package. Replacement Project, Floodplain Phase Dates of publication in the Seattle Daily Journal of Commerce, October 22 and 29, 2024 The Floodplain Phase of the Lower Big Quilcene Bridge Replacement Project includes; 1) 10/29(432738) realignment of 4,591 feet of the Lower Big Quilcene River back into its historic channel location, 2) the construction of 2.262 feet of new river side channels, 3) the regrading and restoration of 800 feet of the existing Big Quilcene River channel, 4) the construction of 684 feet of a new south setback levee. 5) the removal of 765 feet of the existing Rodgers Street, 6) the removal of 928 feet of the existing Fremont Avenue, 7) the removal of the existing. south levee from Rodgers Street west, 8) the removal of 1.861 feet of the existing north levee, 9) the removal of concrete walls. and the regrading of the south shoreline of the new river channel at Station 0+00, 10) the construction of a new road and bridge to access the Bonneville Power towers, and 11) the construction of scour pads around existing BPA power poles Estimated Project Minority and Women's Business Enterprises (MWBE) are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers.

GC Bidding

Bridges / Tunnels

$12,784,785.00

Public - Federal

Demolition, New Construction, Paving, Site Work

33

4

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
45
Bidding Soon
905
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

February 17, 2025

img_map_placeholder

Fremont Ave & Linger Longer Rd, Quilcene, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.