BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 24, 2024 at 7:00 PM

Updated January 11, 2025

This is a service / maintenance or supply contract in Quilcene, Washington. Contact the soliciting agency for additional information.

K9 Pit Rock Development The project consists of, but is not limited to, providing all materials, labor and equipment to drill, shoot, manufacture and stockpile 7,000 tons (5,000 CY) of 1 % -INCH MINUS CRUSHED and 21.000 tons (15,000 CY) of 2 U -INCH MINUS CRUSHED surfacing rock, from the K9 Pit. The estimated cost of the project is $358,200, and the required substantial completion date is June 15, 2025. The project is located at Lat. 47.92N, Long. -123.04W. Location Details Site Address: Lat. 47.92N, Long. -123.04W. City: Quilcene County: Clallam State/Province: WA Site Directions: Lat. 47.92N, Long. -123.04W. Bidders will NOT be charged a fee of $42.00 to submit a bid electronically. The State reserves the right to accept or reject any or all proposals and to waive informalities. To do this work, the contractor must have adequate insurance to hold the State harmless, pay state prevailing wage rates, and have a Washington State Contractor's License. No Prebid Conference is Scheduled

Post-Bid

Roads / Highways

$358,200.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
92
Bidding Soon
1,802
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

February 10, 2025

Project location map

Multiple Locations, Quilcene, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.