BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 18, 2025

Demolition, site work, asbestos abatement and new construction of a clubhouse / community center in Maple Valley, Washington. Completed plans call for the demolition of a clubhouse / community center; for the construction of a two-story above grade clubhouse / community center; and for asbestos abatement for a clubhouse / community center.

Lake Wilderness Community Clubhouse The Work generally consists of furnishing all materials, equip-ment, tools, labor, and other work or items incidental thereto for: The improvements will include the demolition of the existing golf clubhouse, and the construction of a new 2-story clubhouse in the same location. The work includes the following: Site work, including erosion control, soil cut and fill; revi sions and expansion of the exist-ing parking lot and driveway; new utility connections; and new land-scaping and grading. Demolition and removal of the existing 2-story structure, including abatement of hazardous materials per included Asbestos Survey. Construction of a new, 2-story building, including all new foun-dations, structure, mechanical/electrical/plumbing/fire protec-tion systems. Other work necessary to complete the Work as speci fied and shown in the Contract Documents There are no pre-bid meetings scheduled. Bidders are invited to tour the public areas of the grounds and buildings during regular business hours. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the total amount of such bid proposal, including sales tax. Failure to submit the bid bond may result in rejection of your bid. Should the successful bid-der fail to enter into this contract and furnish satisfactory payment and performance bonds within the time stated in the Contract Documents, the bid proposal deposit may be forfeited to the City of Maple Valley, at the city's sole discretion. The City reserves its right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine, in its sole discretion, the most respon- sive, satisfactory and respon- sible bidder. Note: The award of the contract will not occur until the City has reviewed all bids for responsiveness and responsibil- ity determinations, and the City Council has authorized awarding the contract.

Bid Results

Clubhouse / Community Centers

$13,541,904.00

Public - City

Asbestos Abatement, Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
93
Bidding Soon
1,335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

May 2, 2025

Project location map

25400 Witte Rd SE, Maple Valley, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.