BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Demolition, site work, new construction and renovation of a civil project in Anchorage, Alaska. Working plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of 12/19/24, this project has been cancelled due to lack of funding. This is a re-solicitation of IFB #ANTHC 25-B-291808. The project schedule has been adjusted and the requirement for liquidated damages has been removed. The Project includes the following Work: Work of the Project includes rehabilitation of the Pilot Station water treatment plant (WTP) and distribution upgrades. Work includes, but is not limited to, the following: o Construction of temporary bypass of existing system o Demolition of existing treatment, heating, and distribution system piping o Construction of new chlorine room and replacement of existing chlorination equipment o Installation of new raw water heat addition system o Replacement of all existing distribution piping, meters, and instruments o Installation of new concrete pads for equipment as required o Installation of new mechanical and plumbing systems o Installation of new Owner supplied control panels (supplied and commissioned by ANTHC) o Modify existing well control panels as required (will be commissioned by ANTHC) o Installation of water storage tank level transducer and controls o Flush, pressure test, disinfect, and commission systems within the WTP, in coordination with ANTHC The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with constructing water treatment plant distribution systems. Estimated Cost Range: Owner anticipates that the Work's total bid price will be approximately $1,250,000 - $1,700,000. Anticipated Schedule: The Project has an expected substantial completion date of 1 September 2025 and final completion date of 1 October 2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions deadline: 11/13/24 at 11:30 PM

Final Planning

Water / Sewer

$2,128,614.00

Public - Federal

Demolition, New Construction, Renovation, Site Work

69

29

7

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
5
Bidding Soon
155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2024

January 20, 2025

Project location map

To Be Determined, Anchorage, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.