BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a residential development in Anchorage, Alaska. Completed plans call for the construction of a 1,549-square-foot, one-story above grade residential development; and for site work for a residential development.

This is posted on behalf of the Community of Chefornak. Chefornak is addressing erosion, flooding, and permafrost degradation impacts to community infrastructure by developing a new subdivision site where homes will be relocated and replaced with new construction. The subdivision will also be the location for a new Head Start building. The Design-Build Team shall provide IFC design for the following subdivision improvements. The Design-Build Team shall produce a separate plan set for the two tasks. Housing and foundation design is complete. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Architectural Work includes documentation for a 3-bedroom single family home. These homes include an arctic entry/work room, mechanical room, kitchen, living room, 3 bedrooms, and one bathroom. 2. Civil Work is not included in these Contract Documents. 3. Structural systems include a pile system foundation, floor beams and joists, SIP at exterior walls, and truss roof. 4. Mechanical Work includes a boiler heating system with perimeter fin tubes. Ventilation is provided by a enhanced bathroom fan that runs continuously when in 'off' position and at a higher rate when in 'on' position. The water and sewer service will be installed in a different contract at a future time. This building will be plumbed with fixtures installed for direct connection to water and sewer when available. The only plumbing fixture that will not be installed is the toilet. There is a rainwater collection system within the mechanical room. 5. Electrical work includes electrical panel installation. LED lighting will be provided as well as electrical appliances. PID- ANTHC 25-B-116024, 221105.102, 402024.103, M4035 Design-Builder will substantially complete the Work on or before 10/15/2026 ; Final completion- 02/15/2027. PROTOTYPE DESIGN OF 3-BEDROOM HOMES FOR THE CITY OF CHEFORNAK. THE FIRST PHASE INVOLVES CONSTRUCTING (2) PROTOTYPES.

GC Bidding

Residential Subdivision

$381,000.00

Public - Federal

New Construction, Site Work

48

24

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
128
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

April 2, 2025

img_map_placeholder

To Be Determined, Anchorage, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.