Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
Site work and new construction of a mixed-use development in Berkeley, California. Completed plans call for the construction of a 150,000-square-foot, two-story above grade educational facility; and for site work for a educational facility.
CAL SOFTBALL FIELD RENOVATION DESCRIPTION OF WORK: General Description: The Cal Softball Field Renovation Project includes the construction of a new 2 story softball stadium in strawberry canyon at the site of the existing Levine-Fricke Softball Field and adjacent to California Memorial Stadium. The structure is composed of concrete piles and a mixture of structural steel, reinforced concrete and precast concrete. The main areas of the project, which encompass approximately 150,000 gross square feet, include the concourse level, press box area, service level, locker rooms, playing field & seating bowl with a capacity of 1,467 patrons. The completed project will be the new home of the University of California, Berkeley Women's NCAA Softball Team. Bid Package 01 (this contract): This Bid Package consists of all work associated with the scope packages listed above The estimated construction cost of this bid package is $38,000,000 The University has bid and awarded a CM at Risk Contract to PLANT CONSTRUCTION COMPANY, L.P. (hereafter "CM/Contractor"). CM/Contractor is responsible for bidding and awarding all subsequent subcontractor packages, including this package. The successful Subcontractor Bidder shall sign a Subcontract Agreement directly with CM/Contractor, and shall be bound by all the terms of the contract between University and CM/Contractor. Refer to "02.c. UCB Contract Documents" which contains the contract between University and CM/Contractor, attached to the subcontract bidding documents and incorporated by this reference. Bid Package 01 (this contract): This Bid Package consists of all work associated with the scope packages listed above. The estimated construction cost of this bid package is $38,000,000 LICENSE REQUIREMENTS: The work described in the contract is public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. In addition, the successful Bidder will be required to have the following scope specific California current and active contractor's license at the time of submission of the Bid: BUILDER'S RISK PROPERTY INSURANCE 3.6.1 University will provide builder's risk property insurance subject to the deductibles in the policy as required by the General Conditions if the Contract Sum exceeds $300,000 at the time of award and the requirements of the Project are not excluded by such coverage. A summary of the provisions of the policy is included as an Exhibit to the Contract; the policy may be reviewed at the Facility office. Bidder agrees that the University's provision of builder's risk property insurance containing said provisions meets the University's obligation to provide builder's risk property insurance under the Contract and, in the event of a conflict between the provisions of the policy and any summary or description of the provisions contained herein or otherwise, the provisions of the policy shall control and shall be conclusively presumed to fulfill the University's obligation to provide such insurance. Requests for clarification or interpretation of the Bidding Documents shall be addressed to: Mike Cashman AND/OR Juan Taj Taj at mikec@plantco.com AND/OR juant@plantco.com Bid Result : SP 01.1: Surveying and Layout - F3 & Associates, Inc - $127,050 SP 01.2: LEED Connsultant - EA Energy Solutions - $ 18,000 SP 01.4: SWPPP Consultant - Incompli - $ 27,490 SP 02.1: Demolition and Salvage - D-Line Constructors Inc - $ 295,000 SP03.1: Concrete, Site Concrete and Rebar - Plant Construction Company - $ 7,074,264 SP 03.2: Precast Concrete - StructureCast - $ 1,421,115 SP 05.1: Structural Steel , Embeds - Summit Steel Works - $ 2,140,000 SP06.2: Rough Carpentry, FRP - Plant Construction Company, - $987,022 SP 07.1: Roofing, Waterproofing - The Lawson Roofing - $ 1,485,268 SP 08.1: Doors & Frames - Swinerton Builders - $ 277,152 SP 08.2: Windows, Entrances - USGA Inc - $669,123 SP 09.2: Drywall, Framing - Nevell Group - $ 1,924,967 SP 10.1: Signage : Thomas-swan sign co - $ 11,819.00 SP 11.1: Netting - B-Line Construction - $ 956,691 SP 11.2: Audio-Visual - W Bradley Electric - $ 1,293,331 SP 14.1: Elevator - Dream Ride - $265,000 SP 21.1: Fire Sprinkler - Pribuss Engineering - $ 336,465 SP 22.1: Plumbing - N.V. Heathom Company - $ 2,443,944 SP 23.1: HVAC - Broadway Mechanical - $ 626,912 SP 26.1: Electrical fire alarm - decker Electric - $ 5,819,479 SP 31.1: Earth Shoring - Condon-Johnson - $ 850,000 SP 31.2: Deep Foundations - Malcolm Drilling - $ 1,456,576 SP 31.3: Earthwork & Grading - D-line constructors - $ 550,000 SP 31.4: Site-utilities - Azul Works - $ 1,446,000 SP 32.1: Athletic & Recreational Surfacing - Sprinturf - $ 1,634,580 SP 32.3: Landscaping & Irrigation - Martina Landscape - $ 687,190
Bid Results
Educational
$34,824,438.00
Public - State/Provincial
LEED Certification, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2025
April 1, 2025
1602 Centennial Dr, Berkeley, CA
Related To This Project
Berkeley, CA
Bid Date: Dec 19 2024
Berkeley, CA
--
Berkeley, CA
--
Berkeley, CA
Bid Date: Nov 29 2024
Berkeley, CA
Bid Date: Nov 29 2024
Berkeley, CA
Bid Date: Nov 21 2024
Berkeley, CA
Bid Date: Dec 06 2024
Berkeley, CA
Bid Date: Dec 19 2024
Berkeley, CA
Bid Date: Dec 19 2024
Berkeley, CA
--
Berkeley, CA
Bid Date: Nov 08 2024
Berkeley, CA
Bid Date: Apr 30 2025
Berkeley, CA
Bid Date: Jan 16 2025
Berkeley, CA
Bid Date: Nov 19 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
