Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Marion, Ohio. Conceptual plans call for the renovation of a educational facility.
State Funding: $2,095,000.00 Professional Services Start: 02 / 25 Other Funding: $ Construction Notice to Proceed: 06 / 25 Construction Cost: $1,800,000.00 Substantial Completion of all Work: 03 / 26 Total Project Cost: $2,095,000.00 Professional Services Completed: 05 / 26 This project is located at Marion Technical College in Marion, OH. Work will be performed in Bryson Hall which is a 57,248 square feet one-story block building on a concrete slab with HVAC equipment located on the roof. The work should be done with minimal disruption, as the facility will be occupied. Some work may be required overnight. General Improvements to the HVAC, electrical and lighting, flooring/walls/ceiling, will be required to accommodate the renovated use. Improvements include the following, but not limited to: 1. Priority 1 - Update the buildings primary corridor to include flooring, paint, added drywall in selective areas, and replace and or reconfigure select doors. 2. Priority 2 - Renovate the Advising area to include LED controlled lighting, VAV box replacement, ceiling tile replacement, flooring, paint, soundproofing, and possible reconfiguration of entrance and office space. 3. Priority 3 - Renovate 4 Engineering classrooms to include VAV box replacement, LED controlled lighting upgrade, ceiling replacement, flooring, and paint as needed. 4. Priority 4 - Renovate primary restroom facility including VAV and ceiling tile replacement, flooring, paint, wall tile, mirror, and sinks. 5. Priority 5 - Renovate 4 classrooms to include VAV box replacement, LED controlled lighting upgrade, ceiling replacement, flooring, and paint as needed. 6. Please note renovated spaces will receive new furnishings. 7. Additional technology upgrades in classrooms as needed.
Conceptual
Educational
$2,095,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2025
1467 Mt Vernon Ave, Marion, OH
Related To This Project
Marion, OH
Bid Date: Nov 21 2024
Marion, OH
Bid Date: Nov 14 2024
Marion, OH
Bid Date: Oct 30 2024
Marion, OH
Bid Date: Sep 19 2024
Marion, OH
Bid Date: Sep 24 2024
Marion, OH
--
Marion, OH
--
Marion, OH
--
Marion, OH
--
Marion, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.