Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 23, 2024 at 7:00 PM

Updated December 24, 2024

Site work and renovation of a mixed-use development in Pinedale, Wyoming. Working plans call for the renovation of a educational facility; and for site work for a educational facility.

The Project consists of the construction of New service entrances, along with all associated site and utility work for; High School Gym (PAC), East High School, Maintenance, Auditorium, and Middle School. +Existing distribution panels need to be reconnected to new service entrances. New service at Ag/Arts to be sub-fed off Maintenance. Concrete replacement shall be priced as an add alternate SCSD1 Main Campus Power Distribution Upgrades All bids rejected, Scope to be revised. Project to be rebid. Site Address: 665 N. Tyler (P.O. Box 549) Est. Completion Date: July 31, 2026 Description: Project is generally described as completing the campus changeover from Medium Voltage ownership. Electrical site work to facilitate new medium voltage lines by Rocky Mountain Power (RMP). The pathways will continue from junction cabinet installed under phase 1 and will route through the south side of campus and out to a new service point connection (by RMP). Multiple new junction points will be installed. Service laterals will come to a new utility distribution transformer for each building, also by RMP. Contractor will be responsible for providing new pads and vaults for each unit. Sleeves for medium voltage junctions will be furnished by RMP but installed by this Contractor. New secondary conductors will be provided to new exterior service points / distribution gear; and a new service entrance routed into the remaining buildings. After service switchover, Contractor will be responsible to disconnect and remove old transformers and medium voltage cable in their entirety. Landscaping and hard surfaces shall be repaired / replaced to match adjacent areas as needed. Transformers shall be stored in Owner dictated location for sale by Owner. As an Add Alternate price, Contractor shall remove and replace the concrete between Ag/Arts and the Auditorium.

Final Planning

Educational

$80,000.00

Public - County

Renovation, Site Work

21

11

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

Project location map

665 N Tyler Ave, Pinedale, WY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed