BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Huntsville, Alabama. Completed plans call for site work for a water / sewer project.

Questions should be directed, in writing, to Vince Moody at vmoody@madisoncountyal.gov and Jennie Weatherly at jweatherly@madisoncountyal.gov Deadline for questions is November 22, 2024, at 3:00 PM. Madison County is seeking to replace approximately 5,050 feet of asbestos-cement water main with PVC and Ductile Iron pipe along Brownsboro Rd in the Brownsboro area. The Contractor will be responsible for the installation of new main in accordance with the technical specifications. (a) Scope of Services The Contractor shall: o Install approximately 4,900 linear feet of new 8-inch PVC water main by open cut, including hydrants and valve assemblies, as shown on the Construction Drawings; o Install approximately 150 linear feet of new 8-inch ductile iron water main by bridge hanger, including hangers, expansion couplers, and connections, as shown on the Construction Drawings; o Perform open cuts for new main as shown on Construction Drawings; o Pressure test and disinfect the new main and services; o Relocate existing services to the new water main; o Connect the new main to the existing mains; o Repair driveways, culverts, and roadways to original condition or better; o Abandon existing mains and remove old hydrants and valve boxes; o Maintain appropriate erosion control; o Landscape yards and right-of way to original condition or better; o Remove temporary devices (sample taps, blow-offs, erosion control devices) from the site. Except during tie-ins that must be coordinated with Madison County Water, the existing water line shall remain in-service during construction, and work shall be performed to avoid any damage and service disruption to the existing main. The existing main will remain live until the new main and services have been successfully tested, and the new main is ready to connect to the existing main. Construction may be performed in phases. All work must be coordinated with Madison County Water. The work shall be performed according to the conditions, technical specification and drawings provided in this bid package. After notice of award, Payment and Performance Bonds are required to be submitted no later than December 24th.

GC Bidding

Water / Sewer

$765,000.00

Public - County

Site Work

12

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
15
Bidding Soon
489
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

January 1, 2025

img_map_placeholder

Brownsboro Rd, Huntsville, AL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.