BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work and paving for a road / highway in Waveland, Mississippi. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of November 20, 2025, per the owner, an engineer has been selected as a result of the previous solicitation, and this project is still in design. As a result, a timeline for bidding and construction has not been determined. ....................................................... The City of Waveland requests statements of qualifications from professional engineers to provide professional engineering services for the City of Waveland's 'Waveland Kiln Cutoff Road Safety Improvements Project'. RFQ's shall include, but not limited to engineering design, bid, construction phase, and project close-out services for the City's Waveland Kiln Cutoff Road Safety Improvements Project. This project is funded through State of MS. Senate Bill 2468 (Cap Ex) in the amount of $1,000,000 (received) and $3,679,510 (CDBG Grant) through the Community Development Fund - Economic Development Initiative (EDI), and Department of Housing and Urban Development (applied for) via Congressman Mike Ezell's office. The City of Waveland reserves the right to cancel this RFQ at any time without prior notice, to reject any submissions, and to waive any informalities in the RFQ process. The method of Contractor Selection has not been Determined at this time.

Design

Roads / Highways

$4,679,510.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
1
Bidding Soon
400
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Kiln Waveland Cutoff Rd, Waveland, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.