Published January 26, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in West Easton, Pennsylvania. Completed plans call for site work for a water / sewer project.

2024 Sewer Main Rehabilitation Project within the Borough of West Easton located near 237 Seventh Street, West Easton, PA 18042. The work includes but is not limited to all labor, materials, tools, oversight and permits required to provide 8" Sewer line cleaning service, conduct CCTV inspection of 8" dia. pipe and provide report, provide 8" Sewer Main line CIPP lining service along critical areas, and all other work shown or reasonably implied. Question Deadline 12/16/2024 at 3:00 PM ET Location : online portal. Bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania, in accordance with the project specifications in the amount of 10% of the total bid amount. A Performance and Payment Bond in the amount of 100% of the contract shall be furnished by the successful bidder as detailed in the Instructions to Bidders. Davis Bacon Wage Rates shall apply. The Borough of West Easton reserves the right to accept or reject any or all bids or portions or to waive any informalities in bidding and to withhold award for a period of sixty days. Contracting Goals. Tenpercent (10%) ofthe total dollar amount ofall covered construction contracts and subcontracts should be awarded to Section 3 businesses. Progress toward Section 3 contractinggoals should be reported on Attachment F. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Sewer Main Lines Pipe Cleaning. a. Spring Street - Location #1 - Conduct sewer main line cleaning of 8" dia. Pipe location as shown on the design plans and areas shown along the adjacent properties to the south and southeast. b. Main Street - Location #2 - Conduct sewer main line cleaning of 8" dia. Pipe location as shown on the design plans. c. East Street - Location #3 - Conduct sewer main line cleaning of 8" dia. Pipe location as shown on the design plans. d. 5th Street at the intersection of Keystone and Center Street - Location #4 - Conduct sewer main line cleaning of 8" dia. Pipe location as shown on the design plans. 2. CCTV Investigation. a. Spring Street - Location #1 - Conduct CCTV inspection of 8" dia. Pipe as shown on the design plans. b. Main Street - Location #2 - Conduct CCTV inspection of 8" dia. Pipe as shown on the design plans. c. East Street - Location #3 - Conduct CCTV inspection of 8" dia. Pipe as shown on the design plans. d. 5th Street at the intersection of Keystone and Center Street - L inspection of 8" dia. Pipe as shown on the design plans e. Removal of Protruding Lateral connections.

Award

Water / Sewer

$134,963.00

Public - City

Site Work

3

9

6

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Relining Sewers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
264
Bidding Soon
4,412
All Active Projects
2,099
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

January 10, 2025

img_map_placeholder

Multiple Locations, West Easton, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Sewer Main Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.