BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Huntsville, Alabama. Contact the soliciting agency for additional information.

Huntsville Utilities (HU) is accepting Statements of Qualifications (SOQ) from Consulting Engineering Firms (Consultants) to perform engineering services for water main installation projects for a three-year period beginning in FY25 (October 1, 2024) and ending in FY27 (September 30, 2027). The intent of this SOQ process is to establish a list of Consultants capable of supporting HU in water main installation projects. Multiple firms will be selected to provide engineering services. The number of firms selected will be based on the responses to the Request for Qualifications (RFQ). The individual projects will be distributed between the selected firms under task orders. The selection of a Consultant to perform an individual project will based on the capability and availability of the selected firms when a project is identified. Professional Services Statement of Qualifications (SOQ): Currently, the 5-year capital plan includes two water main projects in the next three years. Pulaski Pike Cast Iron Main Replacement: The project replaces approximately 4,300 feet of existing 8-inch cast iron main with 16-inch ductile iron main from the tank at the intersection of Pulaski Pike and Sparkman Drive and ending on the north side of Mastin Lake Road. Mains and services will be connected to the new main and the existing main removed from service. AL Hwy 20 Gunters Way Crossing Wheeler Wildlife Refuge: This project replaces 5,200 feet of an existing 12-inch PVC main with a 24-inch ductile iron water main. Horizontal directional drilling (HDD) of High Density Polyethylene Pipe (HDPE) are options for crossing wet areas in Wheeler Wildlife Refuge. The project is located on the north side of I-565 between the County Line Road and Greenbrier Road exit. This project will require environmental documents and coordination and a new easement from the U.S. Fish and Wildlife Service to cross Wheeler Wildlife refuge. Water Main Relocation Projects: During the performance period of this contract, HU anticipates water main relocation projects. No projects are identified currently. All questions regarding the RFQ must be submitted to Miranda Duke in writing at Miranda.Duke@hsvutil.org prior to noon CST, November 15, 2024. Questions after noon on November 15 will not be answered. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
23
Bidding Soon
439
All Active Projects
164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

Multiple Locations, Huntsville, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.