Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 26, 2024 at 7:00 PM

Updated December 3, 2024

Renovation of a transportation facility in Fairfield, California. Completed plans call for the renovation of a transportation facility.

Fairview-Vacaville Station Upgrades Project. The scope of work for this project consists of: Platform Shelter Glass Remove six (6) existing cracked/broken glass panels from the shelters located on the platform. Dispose of all broken glass, removed seals, and other debris related to this work. Per manufacturer instructions, Install six (6) new "in-kind" replacement panels of tempered glass. After installed, install new anti-graffiti/abrasion protective film "in-kind" on each side of each new piece of glass to match all existing glass panels. Question Deadline 11/25/2024 All interested, qualified firms should review the attached and respond accordingly by All questions should be directed to the Procurement Agent identified on this advertisement NOTES: . Final fixture/product color and style choices must be approved by the Facilities Development Manager. Exact number of glass panels to be replaced will be determined at the job walk. Contractor responsible for all measurements. Any surfaces that are damaged or discolored due to the removal of existing fixtures will need to be painted/repaired/replaced to match the surrounding surfaces. This project consists of platform glass upgrades on the passenger seating shelters at the Fairfield-Vacaville, CA (FFV) Station to enhance Amtrak's assets, provide positive customer service and experience, and improve safety and security for customers and Amtrak employees. Question Deadline 11/25/2024 All interested, qualified firms should review the attached and respond accordingly by All questions should be directed to the Procurement Agent identified on this advertisement Amtrak is currently accepting Letters of Interest for Construction Services in support of our FFV Platform Glass Replacement project.

Post-Bid

Transportation Terminals

$200,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
218
Bidding Soon
3,581
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2024

December 25, 2024

Project location map

Multiple Locations, Fairfield, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed