EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2024 at 7:00 PM

Updated October 1, 2024

Site work, new construction and addition to an educational facility in West Hartford, Connecticut. Conceptual plans call for the addition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

The main office at Wolcott is located internally in the building, limiting the ability of staff to safely allow visitors into the school. This project would create a small addition at the front of the building for the main office, adjacent to the library/media center, and replace the entry canopy. This configuration would address the safety concern that currently exists. In addition, Wolcott has been experiencing a dramatic increase in the number of students requiring additional services beyond the standard classroom, requiring space that is appropriate to provide these services. Currently, several classrooms have been converted to host multiple small groups at one time but this configuration is not conductive to effectively providing these services. There is also one classroom located on the lower level of the building that is not handicapped accessible. The proposed addition would allow for renovation of the existing main office into several small group learning rooms to address the need for additional services and eliminate the classroom in the lower level. Funding in the second year would be utilized to perform the construction and renovation work. This project is included in the Town of West Hartford FY 2024-2035 Adopted Capital Improvement Program. Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$2,500,000.00

Public - City

Addition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
575
Active Projects
359
Bidding Soon
5,316
All Active Projects
2,298
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

71 Wolcott Rd, West Hartford, CT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wolcott Security and Office Improvements - Town of West Hartford

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.