BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Berkeley, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Location 1 Cyclotron Rd., Berkeley, CA 94720 Overaa & Co. is the Construction Manager/General Contractor (CM/GC) for Lawrence Berkeley National Lab (LBNL). This Project is for a New Facility at the same location as former Building 54 and for specific Transit Hub and Utility Project Scope elements collectively called Later THUP. Scope of New Facility (SSM B) and Later Transit Hub and Utilities (Later THUP) includes but is not limited to: Work to build new LEED Gold Facility with cafeteria, conference rooms, patio, medical clinic, badging office, site improvements including refurbished and new vehicle access and drop off, a new pedestrian entry plaza and related sidewalks, ramps and site stairs, new and reconfigured accessible parking spaces, and new shuttle bus shelter. Work includes but is not limited to Structural Concrete, Concrete Reinforcement, Concrete Paving, Architectural Precast, Structural Steel, Metal Fabrications, Steel Decking, Finish Carpentry, Metal Panels, Roofing, Metal Roofing, Waterproofing, Cementitious Fire Protection, Flashings, Expansion Joints, Firestopping, Joint Sealants, Insulation, Doors, Frames, & Hardware, Glazing, Skylight, Demountable Partitions, Overhead Coiling Doors, Framing & Drywall, Painting & Wallcovering, Acoustic Ceiling, Tile, Flooring, Epoxy Flooring, Entrance Mats, Concrete Polishing, Signage, Operable Walls, Specialties, Window Treatments, Loading Dock Equipment, Foodservice, Elevators, Gravity Based Chutes, HVAC, Controls, Electrical, Plumbing, Fire Protection, Fences & Gates, Landscape, Pavement Markings. Scope of Transit Hub and Utilities Project & New Facility Prep Architectural Precast Furnishings includes, but is not limited to: Architectural Precast Furnishing Scope (Please refer to Exhibit B Trade Package 40 - Arch. Precast Furnishing_Furnish Only) Please send your bid proposal no later than 12/6/24. We plan to issue subcontract agreements in early December of 2024. PREQUALIFICATION – All bidding subcontractors and suppliers on this project are subject to prequalification. Precast scope is anticipated to take place in early 2026. Please note this is a prevailing wage project and requires certified payroll. Subcontractors will be required to sign the Overaa Standard Subcontract Agreement, which includes the right for Overaa to require subcontractors to furnish a faithful performance and labor bond, in a form and from a surety acceptable to Overaa, in the amount of 100% of the Subcontract price. A small Business Subcontracting Plan applies to this project. Subcontracting Goals include the following terms, abbreviations, or acronyms are used throughout this Plan and participation goals: ANC - Alaska Native Corporation HUBZone - Historically Underutilized Business Zone Small Business. 3% participation goal. SB - Small Business concern. (ALL SMALL BUSINESS CONCERNS) 50% participation goal. SDB - Small Disadvantaged Business concern. 5% participation goal VOSB - Veteran-Owned Small Business concern 3% participation goal SDVOSB - Service-Disabled Veteran-Owned Small Business concern. 3% participation goal WOSB - Women-Owned Small Business concern. 5% participation goal Disadvantaged Business participation is encouraged, feel free to contact our office should you need further assistance.

Sub-Bidding

Educational

$160,000.00

Public - Federal

LEED Certification, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
90
Bidding Soon
1,839
All Active Projects
776
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 1, 2026

img_map_placeholder

1 Cyclotron Rd, Berkeley, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.