Site work and new construction of a mixed-use development in Uxbridge, Massachusetts. Completed plans call for the construction of a pre-engineered storage facility; for site work for a water / sewer project; and water / sewer project.

Sub-Bids with the required Bid deposit will be received for the following items of work: Subtrades Masonry Acoustical Tile Miscellaneous Metals and Ornamental Iron Plumbing Waterproofing, Damp-proofing, and Caulking HVAC Metal Windows Fire Protection Sprinkler System Painting Electrical Work Please be advised that General Bids and Sub-bids will ONLY be accepted from contractors who have been prequalified for this project by the Town of Uxbridge pursuant to M.G.L. c. 149, Section 44D 1-2 and 44D 3-4. A list of prequalified General Bidders and Sub-bidders will be included in the bid documents for this Project in Section 00200. The work consists of the following major items: 1. Construction of a new 1.2 million gallon per day (MGD) Water Treatment Plant (WTP) that will include two GreensandPlus Filters and two PFAS Media Contactors to remove high concentrations of manganese and PFAS. The building is to be approximately 6,600 square feet constructed of prefabricated metal and is inclusive of process, metal windows, painting, acoustical tile ceilings, plumbing, HVAC, fire protection, electrical, instrumentation, and SCADA. 2. WTP building will include below-slab concrete cast in place water storage tank with backwash supply and finished water pumps and installation of chemical storage and feed systems. 3. Three recently installed wells will be equipped with submersible pumps with pitless adapters and new 6-inch ductile iron discharge piping to the new WTP. 4. Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes. 5. Construction of approximately 700 LF of 1.25-inch HDPE and 600 LF of 4-inch PVC sewer force main from the new WTP to the end of the plant access drive. The force mains will be capped for future connection. 6. Add Alternative No. 1: Office and Administrative Spaces - Enlargement of the proposed pre-engineered metal building to approximately 7,700 square feet to accommodate additional interior office and administrative spaces and includes epoxy flooring finishes as well as additional site and driveway improvements and required work of subtrades. 7. Add Alternative No. 2: Equipment Storage Area - Enlargement of the proposed pre-engineered metal building to 9,900 square feet to accommodate additional Equipment Storage Area and Space for future Process Equipment inclusive of additional site and driveway improvements and required work of subtrades. Bids shall be on a lump sum basis, with additive alternate bid items as indicated in the Form for General Bid. The Work will be substantially completed within 660 calendar days from the date of the Notice to Proceed and completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions within 840 calendar days from the date of the Notice to Proceed. A bid deposit of 5% shall be furnished in accordance with the Instructions to Bidders. The time period for holding Bids, where Federal approval is not required is 90 days, Saturdays, Sundays and legal holidays excluded, after opening of Bids and where Federal approval is required, the time period for holding Bids is 90 days, Saturdays, Sundays and holidays excluded after Federal approval. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.2 percent D/MBE participation and 4.5 percent D/WBE participation by certified DBEs. The two low bidders shall submit completed DBE forms (EEO-DEP-190C EEO-DEP-191C, and the DBE Certification of the United States form) by the close of business on the third business day after bid opening. Failure to comply with the requirements of this paragraph may be deemed to render a proposal non-responsive. Question Deadline 03/31/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website Addendum #1-#5 have been issued as of 3-31-2025.

Post-Bid

Water / Sewer

$22,000,000.00

Public - City

New Construction, Site Work

176

29

43

4

Subscribe For Documents

104 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
705
Active Projects
376
Bidding Soon
4,894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 2, 2025

Project location map

105 Blackstone St, Uxbridge, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.