BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2024 at 7:00 PM

Updated December 24, 2024

Site work and paving for a road / highway in Richmond, Kentucky. Working plans call for site work for a road / highway; and for paving for a road / highway.

This project has been Withdrawn . Madison County Fd05 076 0876 007-010 : Eastern Bypass (Ky 876) (Mp 7.508) Begin at North Porter Drive Extending East to Us 25 / Us 25x (Mp 9.959), a Distance of 2.45 Miles. Pavement (With Alternates). The Department Will Only Accept Bidder Registration Forms From Contractors Who Are Prequalified in the Work Categories of the Particular Project. Registration Will Be Closed at 3:00 Pm on the Day Preceding the Letting. KY DOT - Call 319 - Asphalt Resurfacing - Eastern Bypass (KY 876) PCN - MP07608762401 FD05 076 0876 007-010 EASTERN BYPASS (KY 876) (MP 7.508) BEGIN AT NORTH PORTER DRIVE EXTENDING EAST TO US 25 / US 25X (MP 9.959), A DISTANCE OF 02.45 MILES.PAVEMENT (WITH ALTERNATES) GEOGRAPHIC COORDINATES LATITUDE 37:44:00.00 LONGITUDE 84:19:00.00 ADT 29,029 Questions about projects during the advertisement should be submitted in writing to the Division of Construction Procurement. This may be done by email to kytc.projectquestions@ky.gov.

Final Planning

Roads / Highways

$500,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
58
Bidding Soon
863
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

June 23, 2025

Project location map

Eastern Bypass, Richmond, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.