EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Lower Burrell, Pennsylvania. Completed plans call for the renovation of a educational facility.

A. In general, the Contractor shall submit written certification that Contract Documents have been reviewed, that the Work has been inspected and completed in accord with the Contract Documents and is ready for review by the Architect/Engineer, for Substantial as well as Final Completion. B. When the Architect finds the work acceptable under the Contract Documents, the Architect will request the Contractor make closeout submittals, including but not limited to the following 1. Evidence of compliance with requirements of governing authorities. 2. Project Record Documents (As-Built Drawings) 3. Warranties 4. Operation and Maintenance Manuals 5. Extra Stock Materials 6. Closeout Affidavits 7. Final payment application and adjustment of Contract Sum Boiler Replacement at Burrell High School and Bon Air Elementary School It is the Intent of the Owner to Enter Into a Single Contract for the Work. Bids Shall Include a Bid Security Bond or Certified Check, Payable to Burrell School District, in an Amount of Five Percent (5%) of the Bid, in Accordance With Instructions to Bidders, as Included in the Contract Documents

Post-Bid

Educational

$500,000.00

Public - City

Renovation

11

9

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
61
Bidding Soon
873
All Active Projects
406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

June 9, 2025

img_map_placeholder

Multiple Locations, Lower Burrell, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Re-bid Of Boiler Replacement At Burrell High School and Boiler Rebuilding At Bon Air Elementary

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.