Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work for a water / sewer project in Red Bay, Alabama. Working plans call for site work for a water / sewer project.

** As of February 26,2025 project is going to Rebid . No definite date for the rebid.** The work of providing labor, equipment, and material for the City of Red Bay, Alabama - Hoyt Keeton Walking Trail Storm Drainage Project The principal items of work are detailed herein below: 1. Installation of 60" HD Storm Pipe 2. Storm Inlet Boxes 3. Storm Catch Basins 4. Erosion Control 5. Bank Slope Adjustments The Contract may be awarded to the lowest and responsive Bidder. The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount and must secure his bond from a bonding company's representative or agent in the State of Alabama. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving the Bids. The Contractor is Hereby Advised That Time is of the Essence on This Project and That the Contract Time of 60 Consecutive Calendar Days Total and Noted Restrictions Shall Be Strictly Observed. Liquidated Damages Will Be Assessed if Contract Time is Exceeded. The Contractor May Apply for an Extension of Time In Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. The contractor shall note that funds for this project are provided through CWSRF (Clean Water State Revolving Funds). All Applicable Federal Guidelines must be met. There will be no Pre-Bid meeting. ** Doc info : No refunds will be made except to Prime Contractor Bidders, which shall be refunded for one bid set.

Final Planning

Water / Sewer

$500,000.00

Public - City

Site Work

9

9

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
41
Bidding Soon
532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 30, 2024

August 26, 2025

Project location map

Multiple Locations, Red Bay, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed