Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2025 at 8:00 PM
Updated September 19, 2025
Site work and paving for a road / highway in Red Bay, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of September 18, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The work of constructing The 2025 City of Red Bay Road Resurfacing Project will be let under one Contract that includes various areas. Each area will be considered based on its overall cost. The principal items of work are detailed herein below. Road Resurfacing along 5th Street N.E.; 10th Ave N.W.; Miscellaneous work on Hospital Road, road work in the Brookwood Subdivision; Double H Avenue; miscellaneous work on Gober Drive and 9th Street S.E., at each site. Principal Work: 1. Mobilization (Per Site) 2. Tack Coat (Per Site) 3. Bituminous Concrete Wearing Surface Layer, Leveling & Patching 4. Bituminous Concrete Surface Layer 5. 1.5"- 2" Milling (Per Site) 6. Solid Traffic Stripe (Per Site) 7. Traffic Control Markings (Per Site) 8. Erosion Control (Per Site) 9. Cleanup, Seeding & Mulching (Per Site) 10. Manhole Cover Reset 11. Valve Box Reset (Per Site) 12. Traffic Control (Per Site) No Bid Will Be Withdrawn After the Time for Opening Has Passed. The Owner Reserves the Right to Hold the Bids for a Period of Sixty (60) Days After the Date of Receiving Bids The Owner Reserves the Right to Reject Any and All Bids, to Waive Any Information in Any Bid, and to Accept Any Bid Considered Advantageous to the Owner. The Contractor is Hereby Advised That Time is of the Essence on This Project and That the Contract Time Of 6 0 Working Calendar Days for All Areas Combined and Noted Restrictions Shall Be Strictly Observed. Liquidated Damages Will Be Assessed if the Contract Time is Exceeded. The Contractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. There will be no Pre-Bid Conference for the project All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
Bid Results
Roads / Highways
$157,328.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 18, 2025
September 17, 2025
Multiple Locations, Red Bay, AL
Related To This Project
Red Bay, AL
Bid Date: Aug 18 2025
Red Bay, AL
Bid Date: Sep 24 2025
Red Bay, AL
Bid Date: Oct 16 2025
Red Bay, AL
Bid Date: Dec 05 2025
Red Bay, AL
Bid Date: Mar 27 2025
Red Bay, AL
Bid Date: Mar 27 2025
Red Bay, AL
Bid Date: Mar 27 2025
Red Bay, AL
Bid Date: Dec 30 2024
Red Bay, AL
--
Red Bay, AL
Bid Date: Aug 30 2024
Red Bay, AL
Bid Date: Jul 18 2024
Red Bay, AL
Bid Date: May 16 2024
Red Bay, AL
Bid Date: Mar 28 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.