EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 7, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Brockton, Massachusetts. Completed plans call for the renovation of a educational facility.

Project Bid 2025-01 - Technology Building Switchgear Replacement Project. The project includes all labor, materials, equipment, permits and supervision required for the Technology Building Switchgear Replacement Project. New work shall include, but not be limited to: demolition of existing electrical components, new switchgear, transformers, panelboards, circuit breakers, disconnect switches, conductors and testing of conductors that are to remain, concrete and waterproofing. INTENT OF WORK Except as specified otherwise herein, concrete shall be batched, mixed, placed, tested, and cured in accordance with the American Concrete Institute's "Structural Concrete for Buildings" ACI 301. The Electrical Contractor shall schedule his Work in ample time so that provision for their Work can be made without delaying the progress of the project. It is the intention of the Drawings and specifications to produce concrete which will present an acceptable finished appearance. Imperfections of material or Workmanship shall be corrected as the Engineer directs, at the Electrical Contractor's expense. All the Work that is to be inserted in the forms for attachment of other Work is not described in detail. Sub-Contractor shall carefully examine all drawings and other Sections of these specifications for the extent and detail of all such Work and coordinate this Work with other trades. It will be the Electrical Contractor's responsibility to insure that all concrete surfaces are completely free of any conditions which will adversely affect its finished appearance or the application of a specified finish. Failure to comply with these requirements will require removal of sufficiently large Sections of the Work, as determined by the Engineer, in order to properly integrate the Section to be replaced with the Engineering and structural requirements of the total project. All such removal and replacement shall be made at the expense of the Electrical Contractor at no additional cost to the Owner. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 12/11/2024 at 11:00 AM ET Any questions by prospective Bidders concerning interpretation of the Contract Documents must be submitted in writing to the Awarding Authority.

Award

Educational

$530,580.00

Public - State/Provincial

Renovation

16

24

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Portland Cement Terrazzo Flooring, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Compaction
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
163
Bidding Soon
2,590
All Active Projects
1,148
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2025

January 13, 2025

img_map_placeholder

1 Massasoit Blvd, Brockton, MA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Technology Building Switchgear Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.