BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2024 at 7:00 PM

Updated December 5, 2024

Site work for a water / sewer project in Del Rio, Texas. Conceptual plans call for site work for a water / sewer project.

The City of Del Rio would like to receive statements of qualification in response to a request for qualifications (RFQ) for selection of an engineering firm to complete final design, coordinate related Plans, Specifications and Design Report approval with TCEQ, provide bid support, and provide construction administration. Once statements of qualification are received, a committee consisting of staff members in key positions will review and evaluate based on criteria included in the request for qualifications document. The City intends to recommend the awarding of a contract to the highest evaluated vendor. The City will be accepting statements of qualification up until 2:00 PM CST on December 10, 2024. Statements of Qualifications can be mailed, or hand delivered. All submittals received after this time will not be accepted and will be returned unopened. Electronic submittals are not available. This solicitation does not commit the City of Del Rio to award a contract, to pay any costs associated with the submission or preparation of any proposal submitted, or the procurement of the project for which submittals are being received for. The received statements of qualifications will be reviewed by a team consisting of City of Del Rio Employees for completion and will be rated based on metrics that will be listed later in this document. The City reserves the right to request additional information from an individual or to request all submitters to submit supplemental materials in fulfillment of the content requirements of this request for qualifications (RFQ) or to meet additional information needs of the City. The City also reserves the unilateral right to waive any technical or format requirements contained in the RFQ. Agarita is a 387 feet deep open hole Edwards well developed in the Salmon Peak formation and cased to 314 feet. The well historically produced up to about 2,000 gallons per minute with 90 feet draw-down. The well needs to be cleaned (jetted), logged, pump tested, and sampled to confirm production capacity and water quality. If these evaluations support public water system use, then final design will proceed promptly. TCEQ has accepted the following temporary emergency use improvements, subject to the granting of a cartridge filter variance (now under review) and final design approval. The City of Del Rio reserves the right to reject any and all statements of qualification, to waive any informalities or irregularities, as it shall deem to be in the The offeror shall sign and date the Submittal Affidavit (Attachment 1). The person signing the submittal must have the authority to bind the firm in a contract. Submittals which are not signed and dated in this manner will be rejected. The City reserves the right to request additional information from an individual or to request all submitters to submit supplemental materials in fulfillment of the content requirements of this request for qualifications (RFQ) or to meet additional information needs of the City. The City also reserves the unilateral right to waive any technical or format requirements contained in the RFQ. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$250,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
57
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2025

Project location map

To Be Determined, Del Rio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.