BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2025 at 8:00 PM

Updated October 5, 2025

Site work for a water / sewer project in Del Rio, Texas. Completed plans call for site work for a water / sewer project.

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality. The Construction includes, but is not limited to, preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead. The following constraints apply: The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work on during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holi. There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be . The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons). Access to the is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds. Workers pass through the port of entry to access the work. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States. Per FAR 36.204, the magnitude of the project is estimated between 1,000,000 and 5,000,000. The work is located in Val Verde County, Texas. A visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price. All work is proposed to be completed within four hundred and eighty five (485) calendar after the Notice to Proceed. Three sixty-five (365) calendar are anticipated for construction. The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar of completion of construction. The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar . The time stated for completion shall include final cleanup of the premises. This Solicitation will be issued pursuant to FAR Part 14. All responsible sources submit a bid to be considered by the Agency. Please see document named SBU Document Notice for information in receiving additional documentation. s shall be submitted to arrive at the aforementioned address no later than 6/2/2025, 10:00 AM MDT. The Contractor shall begin performance within 10 calendar and complete it within 485 calendar *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$2,589,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

27

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
1
Bidding Soon
58
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

September 11, 2025

Project location map

To Be Determined, Del Rio, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.