Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 24, 2025 at 8:00 PM
Updated April 26, 2025
Site work, paving and outdoor lighting for a mixed-use development in East Moline, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Pavement reconstruction, sidewalks, storm sewer, curb and gutter, traffic signals, lighting, and landscaping on 15 Avenue from 6th Street to 13th Street in East Moline. Region : 2 District : 2 Federal Project # VI5U(891) County(S): Rock Island Key Route(S): FAU 5757 Marked Route(S) : 15 Avenue Section(S) : 22-00159-00-PV, 22-00159-01-PV State Job #(S) : A-92-003-23 Pps #(S) : 2-10641-0010 Contract Specifics Completion Date: November 20, 2026 Plus 10 Working Days Questions Not Accepted as of April 15, 2025 04:30 Pm Questions Directed to: Idot Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, Il 62764 (217) 782-7806 Fax: (217) 785-1141 Tdd: (217) 524-4875 Dot.de-contracts@illinois.gov Unless Otherwise Indicated, a Proposal Guaranty is Required by Bid Bonds, Cashiers Check or Properly Certified Check for Not Less Than 5 (Five) Percent of the Bid Amount. If the Proposal is Accepted and the Bidder is Declared Not Responsive, It is Hereby Agreed That the Amount of the Proposal Guaranty Will Become the Property of the State of Illinois and Shall Be Considered as Payment of Damages Due to the Delay and Other Causes Suffered by the State Because of the Failure to Adhere to the Procedures Required. Otherwise, the Bid Bond Will Become Void or the Proposal Guaranty Check Will Be Returned to the Bidder. Contractors Who Desire to Become Prequalified or to Renew Their Prequalification for This Letting Must File With the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition No Later Than 4:30 Pm Prevailing Local Time, April 04, 2025. A Contractor Will Not Be Prequalified for This Letting Unless the Statement is Received Before the Time and Day Established. The Department Reserves the Right to Reject Any and All Bids, to Waive Minor or Immaterial Irregularities, Informalities or Technicalities, to Advertise for New Bids, or to Request Confirmation or Clarification From Any Bidder Regarding a Bid. ILDOT - 196 - Pavement Reconstruction, Sidewalks, Storm Sewer, Curb and Gutter, Traffic Signals, Lighting, and Landscaping on 15 Avenue
Post-Bid
Roads / Highways
$2,409,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
June 24, 2025
15th Ave, East Moline, IL
Related To This Project
East Moline, IL
Bid Date: Feb 11 2025
East Moline, IL
Bid Date: Feb 18 2025
East Moline, IL
Bid Date: Mar 04 2025
East Moline, IL
Bid Date: Mar 18 2025
East Moline, IL
Bid Date: Mar 04 2025
East Moline, IL
Bid Date: Apr 15 2025
East Moline, IL
Bid Date: Mar 27 2025
East Moline, IL
Bid Date: Apr 07 2025
East Moline, IL
Bid Date: Dec 16 2024
East Moline, IL
--
East Moline, IL
--
East Moline, IL
Bid Date: Sep 03 2024
East Moline, IL
Bid Date: Aug 27 2024
East Moline, IL
Bid Date: Aug 27 2024
East Moline, IL
Bid Date: Jul 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
