Published February 5, 2025 at 7:00 PM

Updated February 6, 2025

Site work for a water / sewer project in New Town, North Dakota. Completed plans call for site work for a water / sewer project.

The scope of WORK generally consists of mobilization and furnishing of all labor, equipment, and all work required to install 1" POLY, 1 1/2 " and larger PVC gasketed joint pipe, water services, road crossings, restrained joint areas, connections to existing pipelines, concrete manhole water depots, and all other related appurtenances as required to provide water service to subsequent users and provide system improvements located Fort Berthold Reservation wide. The Owner may have some of the materials required to complete the work detailed in the Plans and Specifications. The Contractor may purchase these materials from the Owner. A plan set has been developed with the work planned to be completed under this Contract. Additional work is planned to be completed under this Contract, but the ROW acquisition is currently underway and not yet completed. The Contractor will be issued Work Orders as work becomes approved for construction. Bid item quantities are for bid purposes only and are estimated for upcoming work, however, there is no minimum guarantee on a minimum total amount of work that will be issued via work orders for construction. Question Deadline 01/17/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Contractor is advised that no work (as identified in the Bid Schedule) shall commence until initiated by a formal Work Order issued by the Owners Representative. Work Orders will be first sent to the Contractor for approval signature and further circulated for approval signatures of the engineer, owner and funding agency. A formal Work Order will have a work order number, description, deadline for work to be complete, and all approval signatures. Once all approval signatures have been obtained a formal work order will be issued to the contractor to initiate construction. Final payment for each respective Work Order will be based on actual installed quantities, as set forth in the contact Documents. Please see Work Order example in Contract Documents. Bidders on this work will be required to comply with the Presidents Executive Order No. 11246 - Equal Employment Opportunity, as amended. The requirements for Bidders and Contractors under this order are explained in the contract documents. In the evaluation of bids, the Three Affiliated Tribes will give preference in the amount of 2% above the lowest responsive bid received to Certified Indian Contractors. In order to qualify as a Certified Indian Contractor, the Contractor must register with the local Tribal Employment Rights Office (TERO) prior to the bid opening and each Bid must be accompanied by a copy of Contractor(s) current and valid Indian-certified firm certification issued by the TERO Office. Contractor(s) and any of the Contractor(s) subcontractors bidding on this project should be aware that they will be required to comply with the TERO Regulations of the Three Affiliated Tribes. Notice is hereby given to any and all Contractors who bid on projects on trust land within the exterior boundaries of the Fort Berthold Reservation that Contractors are responsible for payment of the Tribal TERO Tax, which amounts to two and a half percent (2.5%) of the gross receipts from each Prime Contract. Arrangements for the payment of this tax are to be made prior to beginning work with the TRIBAL EMPLOYMENT RIGHTS OFFICE (TERO). Three Affiliated Tribes Fort Berthold Indian Reservation MHA TERO/Energy Building - Four Bears Complex New Town, ND 58763-0488 Prior to beginning of work on any contract or subcontract, the Contractor shall file a report with the TERO Office and FBRW showing: 1. Date of contract and amount of contract. 2. Location of land on which the contract will be performed. 3. Names and addresses of all parties of the contract. 4. When work is expected to begin or end. Notice is hereby given to any and all Contractors who bid on projects on trust land within the exterior boundaries of the Fort Berthold Reservation that Contractors are responsible for compliance with MHA DOT regulations. Contractors shall register company vehicles with the MHA DOT prior to beginning work. Contractors are required to obtain a Tribal Three Affiliated Tribes Environmental Department (TAT ED) waste management permit prior to beginning any construction or demolition work on the Reservation. The permit fee shall be payable to the Tribal TAT ED and shall be for the sum of one percent (1.0%) of the total Contract. For the purposes of this requirement, a Prime Contractor is the prime contractor responsible for construction or demolition projects funded by a federal agency, Tribal Government, or other commercial construction. The Owner reserves the right to hold all bids for a period of 61 days after the date fixed for the opening thereof, and to reject any or all bids, and to award the Contract, if awarded, to the Contractor with the Bid that is determined to be in the best interest and most advantageous to the Owner. The Owner reserves the right to award the Contract, if awarded, based on the received bids and will make the determination of the Bid(s) that is in the best interest and most advantageous to the Owner.

Bid Results

Water / Sewer

$3,385,549.00

Public - Federal

Site Work

18

33

11

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
8
Bidding Soon
82
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2025

February 24, 2025

Project location map

Multiple Locations, New Town, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.