BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 28, 2026 at 8:00 PM

Updated September 15, 2026

Site work and paving for a bridge / tunnel in Medford, Oregon. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Region 3 Or99: Rogue River Bridge, Gold Hill Spur Project Gold Hill Spur Highway, Ricky Zeedyk, Re OR99: Rogue River Bridge, Gold Hill Spur Project on the Gold Hill Spur Highway (Rt. No. OR99) in Gold Hill. FAP No. S486(000). ($ 10,000,000 - $ 20,000,000). Req. approx. 670 ft2 temp. signs; 3 ea PCMS; 4,700 hrs ped. trans. veh.; 565 ft PCD; 65 yd2 matting; 6 ea ch. dam; 2 contr. entr.; 1,045 ft sed. fence; 3 ea inlet prot.; 770 ft sed. barr.; 1 ea temp. ener. dis.; 54 ton contam. soil disp.; const. surv. wrk.; 996 ft asph. pvmt. sawcut.; 1,010 yd3 emb.; 56 yd2 subg. stab.; 1,681 yd2 geot.; 125 yd3 riprap; 20 ft vid. insp.; 2,881 ft pipe; 1 ea conc. inlet; 54 ft drain. curb; 3 ea adj. inlet; 40 yd2 tr. resurf.; 47 yd3 str. exc.; 75 yd3 gran. wall bkfl.; 113,900 lbs reinf.; 87 ft inj. & seal crk.; 432 yd3 dk. conc.; 59 yd3 gen. str. conc.; 1,055 yd2 surf. text.; 8 ea reinf. bar rep.; 40 ft2 conc. rep.; 4 ft2 mrtr. bldup. over shall. reb.; 1,022 ft titan. sys.; 251 ft pour. jt. seal; 451 ft ped. rl.; 121 ft vert. conc. para.; 902 ft hist. orn. conc. rl.; util. att. on str.; 451 ft comm. cond.; 706 ft prot. cas.; 4 ea perm. grnd. Anchor; 4 ea perf. test; 2 ea ver. test; prep. & coat conc. str.; 1,189 yd2 CPPR; 1,110 ton aggr. base; 605 ton ACP; 66 ft2 conc. walks; 438 ft gd. rl.; 4,360 ft thermo. striping; 96 fbm wood sign post; 0.2 yd3 conc. in sign sup.; 95.2 lb st. in sign sup.; 36 ft2 signs; wtr. qual. swale; 0.9 acres seeding; 1,200 ea wetland plants. This project requires Railroad Insurance Class of Work: Bridges and Structures. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 002 - OR99: Rogue River Bridge, Gold Hill Spur

GC Bidding

Bridges / Tunnels

$20,000,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
19
Bidding Soon
266
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2026

November 23, 2026

Project location map

OR-99, Medford, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.