Site work and paving for a road / highway in Riverside, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2025 Street Maintenance Asphalt Each bid must be accompanied by a bid bond payable to the City for five percent (5%) of the total amount of the bid. A certified check made payable to "The Treasurer of the City of Riverside" may be used in lieu of a bid bond. Attorneys-in-fact who sign bid bonds must file with each bond a certified and effectively dated copy of their power of attorney. Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the City and to fully complete the project by 6/30/2025. Bidder must agree also to pay as liquidated damages, the sum of $500 for each consecutive calendar day thereafter as hereinafter provided in the Agreement and Contract Documents. No time extensions will be granted, except in case of unusual (unseasonable) weather conditions or additional work requested by the City The City reserves the right to waive any informality or to reject any or all bids. Each bidder must provide a bid bond in the amount, form and subject to the conditions provided in the Information for Bidders. No bidder may withdraw a bid within 90 days after the actual date of the opening thereof. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and prevailing wage rates to be paid. Contractor shall perform the following Work as more fully set forth in the Contract Documents: All Work necessary to construct the 2025 STREET Maintenance - Asphalt through the limits of the Project as shown on and in accordance with the Technical Specifications and/or Drawings referred to in Exhibit G to the Agreement. The Work in the Project shall include but is not limited to the items listed on the Bid Form. Contractor to provide all necessary equipment, labor, and material necessary to perform the Project construction and related work as shown in the Contract Documents. The Work includes, but is not limited to, the following: 1. Schedule and Coordinate all necessary inspections. 2. Contractor shall coordinate with all utilities prior to the work starting, including contacting underground locator services, ensuring that all power has been disconnected. 3. Include all temporary utility fees and permits. 4. Include 3 rd party Special Inspections as required to demonstrate compliance with project specifications, including but not limited to compaction and proof rolls and material testing. 5. Include all premium time/cost necessary to meet the schedule, including accelerated production of submittals. 6. Include all surveying, layout and field engineering required for the performance of this work. 7. Provide digital photographs of the preconstruction, construction, and post construction site (see Article IV Progress of Work / Submittals (F) for specifics) 8. Provide all weather provisions to meet the schedule set forth in the contract documents. 9. Provide clean up associated with the contractors work. Site is to remain free of debris during the construction process. 10. Provide all traffic control as required throughout the construction process. Under this section of the Specifications, the Contractor shall provide all labor, materials, tools and equipment necessary to complete the following items of work: 1. Bituminous concrete pavements.

Post-Bid

Roads / Highways

$80,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
65
Bidding Soon
912
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 10, 2025

Project location map

Multiple Locations, Riverside, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.