Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Site work for a bridge / tunnel in Fort Thompson, South Dakota. Completed plans call for site work for a bridge / tunnel.
Retrofit Bridge Sidewalk with Pedestrian Railing Should you have questions you are encouraged to contact Area Engineer Brad Letcher (605-353-7140) A bid bond will not be required. The successful bidder must provide a performance bond in the total amount of the contract prior to beginning work on the project as per section 3.5 of the Standard Specifications A cashiers check, money order or other monetary instrument in the total amount of the contract, made out to and under the full control of the Department is acceptable in lieu of a performance bond. Such bond shall remain in effect for not less than one year after date of acceptance of the completed contract by the Department. In accordance with current bidding procedures, Administrative Rules 70:07:02, a bidder must be prequalified prior to bidding on state highway construction projects, unless his bid is less than $250,000. Bidders must be prequalified for the Work Type(s): Work Type 8, Bridge Rehabilitation SDDOT: Retrofit Bridge Sidewalk With Pedestrian Railing
Award
Bridges / Tunnels
$211,250.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 10, 2025
February 10, 2025
SD-47, Fort Thompson, SD
Related To This Project
Fort Thompson, SD
Bid Date: Feb 25 2025
Fort Thompson, SD
Bid Date: May 08 2025
Fort Thompson, SD
--
Fort Thompson, SD
Bid Date: Nov 13 2025
Fort Thompson, SD
Bid Date: Dec 16 2024
Fort Thompson, SD
Bid Date: Feb 25 2021
Fort Thompson, SD
Bid Date: Jun 23 2021
Fort Thompson, SD
Bid Date: Aug 08 2024
Fort Thompson, SD
Bid Date: Apr 11 2024
Fort Thompson, SD
Bid Date: Mar 25 2022
Fort Thompson, SD
Bid Date: Jun 28 2023
Fort Thompson, SD
Bid Date: Jul 17 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
