BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated April 17, 2025

Site work and paving for a road / highway in Lake Buena Vista, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

License Requirements FDOT Prequalifed Contractor Liquidated Damages $2,579/day Start/Delivery Date Approx. February 2024 Project Duration 180 days from NTP Question Deadline 01/10/2025 at 6:00 PM ET Online Q&A Yes The scope of work for the 2025 Milling & Resurfacing Pavement Program includes, but is not limited to: >Maintenance of Traffic/ Lane Closures >Erosion and Sedimentation Control >Guardrail Removal and Replacement >Curb and Gutter Removal and Replacement >Milling and Resurfacing >Signage >Pavement Markings Osceola Parkway from BVD to World Drive milling & resurfacing includes milling depths ranging from 4" to 1.5" and shall utilize the following asphalt courses: SP Structural (Traffic E) (PG76-22), Friction Course FC-5 (PG 82-22) and Friction Course FC-12.5 (Traffic E) (PG82-22). The guardrail requiring replacement, in order to meet updated guardrail specifications, span across the following locations: northbound and southbound World Drive corridor, east and westbound Epcot Center Drive and as well as east and westbound Osceola Parkway. NOTE: The guardrail shall be bid as separate bid alternates with cost broken out for each run as described in Division 1 Specification Section 1100, as well as noted in the bid form and Table 1. Existing guardrail shall be removed, miscellaneous asphalt pad removed and new asphalt replaced and rolled in prior to new guardrail installation. All removed guardrail runs shall be replaced within the same shift, or will otherwise need barrier wall installed to protect existing conditions (to be designed and submit as part of the Contractor's TTC Plan). Embankments adjacent to all guardrail pads shall be graded to meet required slopes. Fill dirt may be required as needed. Some minor curb and gutter replacement work, as well as tree clearing work is to be performed as noted in the plans. Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00%

Award

Roads / Highways

$4,868,620.00

Public - County

Paving, Site Work

60

16

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
206
Bidding Soon
2,889
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

February 17, 2025

Project location map

Multiple Locations, Lake Buena Vista, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.