Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 5, 2025 at 7:00 PM
Updated April 17, 2025
Site work and paving for a road / highway in Lake Buena Vista, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
License Requirements FDOT Prequalifed Contractor Liquidated Damages $2,579/day Start/Delivery Date Approx. February 2024 Project Duration 180 days from NTP Question Deadline 01/10/2025 at 6:00 PM ET Online Q&A Yes The scope of work for the 2025 Milling & Resurfacing Pavement Program includes, but is not limited to: >Maintenance of Traffic/ Lane Closures >Erosion and Sedimentation Control >Guardrail Removal and Replacement >Curb and Gutter Removal and Replacement >Milling and Resurfacing >Signage >Pavement Markings Osceola Parkway from BVD to World Drive milling & resurfacing includes milling depths ranging from 4" to 1.5" and shall utilize the following asphalt courses: SP Structural (Traffic E) (PG76-22), Friction Course FC-5 (PG 82-22) and Friction Course FC-12.5 (Traffic E) (PG82-22). The guardrail requiring replacement, in order to meet updated guardrail specifications, span across the following locations: northbound and southbound World Drive corridor, east and westbound Epcot Center Drive and as well as east and westbound Osceola Parkway. NOTE: The guardrail shall be bid as separate bid alternates with cost broken out for each run as described in Division 1 Specification Section 1100, as well as noted in the bid form and Table 1. Existing guardrail shall be removed, miscellaneous asphalt pad removed and new asphalt replaced and rolled in prior to new guardrail installation. All removed guardrail runs shall be replaced within the same shift, or will otherwise need barrier wall installed to protect existing conditions (to be designed and submit as part of the Contractor's TTC Plan). Embankments adjacent to all guardrail pads shall be graded to meet required slopes. Fill dirt may be required as needed. Some minor curb and gutter replacement work, as well as tree clearing work is to be performed as noted in the plans. Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00%
Award
Roads / Highways
$4,868,620.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 16, 2025
February 17, 2025
Multiple Locations, Lake Buena Vista, FL
Related To This Project
Lake Buena Vista, FL
Bid Date: Jan 09 2025
Lake Buena Vista, FL
Bid Date: Feb 06 2025
Lake Buena Vista, FL
Bid Date: Feb 12 2025
Lake Buena Vista, FL
Bid Date: Feb 27 2025
Lake Buena Vista, FL
Bid Date: Jan 30 2025
Lake Buena Vista, FL
--
Lake Buena Vista, FL
Bid Date: Mar 28 2025
Lake Buena Vista, FL
Bid Date: Mar 31 2025
Lake Buena Vista, FL
Bid Date: Feb 28 2025
Lake Buena Vista, FL
--
Lake Buena Vista, FL
Bid Date: Jan 09 2025
Lake Buena Vista, FL
Bid Date: Dec 18 2024
Lake Buena Vista, FL
Bid Date: Mar 26 2025
Lake Buena Vista, FL
Bid Date: Dec 05 2024
Lake Buena Vista, FL
Bid Date: Oct 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
