BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2025 at 7:00 PM

Updated February 18, 2025

Demolition, site work and asbestos abatement for a mixed-use development in Sparta, Tennessee. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; for asbestos abatement for a municipal facility; and water / sewer project.

W. Bockman Way Building Demolition The City of Sparta is seeking qualified contractors to submit proposals for the demolition of a building located at 211 W. Bockman Way. The purpose of this project is to safely and efficiently demolish the specified structure, ensuring compliance with all relevant regulations and minimizing disruption to the surrounding area. Payment will not be made until the City Administrator inspects and approves work Demolition: Perform complete demolition of the building, including removal of all structural components, foundations, and utility disconnections as required. All Utilities have been turned off prior to proposal request. Debris Removal: Haul away and dispose of all demolition debris, including non-hazardous and hazardous materials, in compliance with waste management regulations. Provide weigh tickets for all materials required to be disposed in proper landfill. Safety and Compliance: All work will comply with applicable regulatory requirements, including but not limited to OSHA standards for worker safety, and local building codes. City will waive all City issued permits. Pre-Demolition Planning Obtaining necessary permits and approvals. Conducting a pre-demolition site assessment. Preparing a demolition plan including timeline and safety measures. Traffic control will be the responsibility of contractor. Contractor will be liable for any damages to Bockman Way or Traffic. Demolition Activities Safe and controlled demolition of the building structure and foundation slab. Removal of all debris and waste materials from the site. Bockman Way sidewalk should be protected to best of their ability, City will repair if needed. Post-Demolition Activities Site cleanup from all debris. Final inspection and sign-off from city administrator The City of Sparta reserves the right to accept or reject any or all proposals.

Award

Municipal

$27,500.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
32
Bidding Soon
1,266
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 28, 2025

Project location map

211 W Bockman Way, Sparta, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.