Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2025 at 7:00 PM
Updated February 19, 2025
Site work and paving for a road / highway in Aspen, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reference Number 0000370753 Job Location: Pitkin County, CO Pitkin County is qualifying interested parties for the provision of trail paving and retaining wall construction at various locations on the Rio Grande Trail, Basaltmass Trail, Crystal River Trail, and North River Road located in Pitkin County, Colorado. Question Deadline 01/23/2025 at 4:00 PM MT Questions are submitted online No, Any and all questions, or requests for clarification, must be submitted by time. Questions and requests for clarification will only be accepted via email at procurement@pitkincounty.com Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Performance Bond 50 % SCOPE OF WORK A. SPECIFICATIONS Pitkin County Open Space and Trails Department is requesting proposals from qualified contractors to implement the project described in the attached engineered plan set. This project consists of the full depth replacement and mill and overlay of asphalt trail along specified regions of the Rio Grande Trail, Basaltmass Trail, Crystal River Trail, and North River Road in Pitkin and Garfield Counties, Colorado. Additionally, the project consists of the construction of retaining walls along specified regions of the Rio Grande Trail and Basaltmass Trail. The selected contractor will be held to high standards for minimizing impacts and disturbance to surrounding area of construction zones, disruption of trail use, as well as neighboring properties. The following values have been determined as critical for the successful completion of the project: 1. Quality 2. Integrity 3. Communication (Create a clear and transparent method for communication with county staff and the public.) 4. Timeframe/Availability/Phasing 5. Aesthetics (project should be sensitive to and complement the surrounding natural environment) 6. Sustainability (e.g. use of local resources where possible, reuse of materials where possible, etc.)
Post-Bid
Roads / Highways
$200,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2025
March 3, 2025
Multiple Locations, Aspen, CO
Related To This Project
Aspen, CO
Bid Date: Jan 24 2025
Aspen, CO
Bid Date: Jan 31 2025
Aspen, CO
Bid Date: Feb 11 2025
Aspen, CO
--
Aspen, CO
--
Aspen, CO
Bid Date: Feb 24 2025
Aspen, CO
Bid Date: Dec 30 2024
Aspen, CO
Bid Date: Jan 20 2025
Aspen, CO
Bid Date: Jan 22 2025
Aspen, CO
--
Aspen, CO
Bid Date: Jan 10 2025
Aspen, CO
Bid Date: Jan 10 2025
Aspen, CO
Bid Date: Dec 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
