BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Site work and outdoor lighting for a road / highway in Atascadero, California. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Direction drilling bore approximately 3,000 linear feet of 2" HDPE conduit and install new service conductors (3 x #6AWG, 1 x #8AWG ground) between existing pull boxes for lighting improvements for the El Camino Real Downtown Infrastructure Enhancement Project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 01/02/2025 at 5:00 PM PT

Award

Roads / Highways

$212,980.00

Public - City

Outdoor Lighting, Site Work

9

7

141

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
36
Bidding Soon
441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

Project location map

El Camino Real, Atascadero, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.