BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2024 at 7:00 PM

Updated December 28, 2024

Demolition, site work, paving and new construction of a sidewalk / parking lot in Festus, Missouri. Conceptual plans call for the demolition of a sidewalk / parking lot; for the construction of a sidewalk / parking lot; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Festus R-VI School District is seeking general contracting services to engineer, design, and implement and complete construction of a new parking lot including the demolition of two existing residential facilities. Festus School District owns two residential properties located at 1601 and 1608 Mid-Meadow LN in Festus, MO 63028. The current dwellings and all structures on these properties are to be demolished and removed, including foundations. The property at 1601 Mid-Meadow Ln will be backfilled and graded to accommodate future construction. The property at 1608 Mid-Meadow will be restored as a new parking lot. This will require the design and engineering to comply with all city, county, state, and federal requirements. Questions should be addressed to Steve Copeland, Director of Maintenance, at copelandsteven@festusedu.com. Performance and Payment Bonds Upon award of bid, Bidder shall be required to submit to the District proof of a Performance Bond. Bond Company must be a U.S. Company with an A+ best rating and licensed in all 50 states. Contractor will provide proof of the bonding company with their initial bid. Permits The vendor shall be responsible for securing any necessary city, county, state, and/or federal permits prior to commencing work. Payment Terms The Festus R-VI will make payment in full (100%) following the next board of education meeting after the project is complete and accepted by authorized R-VI officials. If the contractor desires other payment arrangements, please detail within bid. Deadline for Completion of Project Pending awarding of the bid, the project must be completed within the timelines established between the contractor and R-VI District. Vendors may have access to the facility during this time period at all times during the 24-hour day as long as arrangements are made in advance with school officials and the facility is available. It is imperative that the vendor be able to complete work on established timelines. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$200,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
0
Bidding Soon
762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

Project location map

Multiple Locations, Festus, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.