BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in West Memphis, Arkansas. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The work consists generally of the following: abandonment of 1,400-ft of 8-in sewer force main in place, abandonment of 822-ft of 12-in sanitary sewer and 3 sewer manholes with flowable fill,installation of 1,760-ft of 8-in PVCSDR- 21 sewer force main, installation of 780-ft of 18-in PVC SDR26 gravity sewer main and 3 sewer manholes, and 110- ft of 24-in steel casing. Included in this work will be bypass pumping,concrete work, pavement repair,traffic control, erosion control, site stabilization, and all other necessary and related work to complete the project as shown on the plans and described in the specifications. All Bidders must be licensed contractors to perform the type construction herein described, as required by the State of Arkansas. A certified check or bank draft, payable to the West Memphis Utility Commission, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total of Bid, shall be submitted with each Bid . Submittal of aminimum of three (3) copies of the Bid response is required, one (1)original and two (2) copies. Any Bidder, upon written request, will be given permission to withdraw his Proposal not laterthan the time set for opening. Bids accepted and read will remain effective for a period of sixty (60)days after the date and time setfor the opening of such bid. The West Memphis Utility Commission is an equal opportunity affirmative action employer, drug free with policies of non-discrimination on the basis of race, sex, religion, color, national or ethnic origin, age, disability or military service. The West Memphis Utility Commission reserves the right to reject any or all bids in whole or inpart, with or without cause; and to accept the lowest bid per location which in its judgement will be for the best interest of the WestMemphis Utility Commission. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Water / Sewer

$750,000.00

Public - City

Paving, Site Work

11

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
26
Bidding Soon
309
All Active Projects
128
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

March 10, 2025

img_map_placeholder

Multiple Locations, West Memphis, AR

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.