BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2025 at 8:00 PM

Updated April 6, 2025

Renovation of a military facility in Monument, Colorado. Completed plans call for the renovation of a military facility.

The intent of the contract is to provide for the construction and completion of the work described below. The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. The work shall consist of supplying, delivering, and installing an accessible precast concrete Granite Peak (10 x 18), or approved equivalent, utility building at Monument Fire Center in accordance with the Statement of Work (SOW). All pad prep such as excavation and backfill shall be completed by the government. Buildings are to be shipped assembled or assembled on-site by the contractor. Building assembly shall not be the responsibility of the government. Estimated Magnitude of Construction - $25,000 to $100,000 All questions are due via email to the POC listed in block 10 by 1:00 PM Central Time on 13 March 2025. The Contractor shall begin performance within 10 calendar days and complete it within 117 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$100,000.00

Public - Federal

Renovation

6

11

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
89
Bidding Soon
1,249
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 23, 2025

Project location map

To Be Determined, Monument, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.