BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

This is a service / maintenance or supply contract in Jackson, California. Contact the soliciting agency for additional information.

El Dorado Irrigation District (District), an irrigation special district organized and existing under the California Irrigation District Law (Water Code 20500, et seq.), hereby gives notice that it is now accepting proposals for the preparation of a California Environmental Quality Act (CEQA) Environmental Impact Report (EIR), National Environmental Policy Act (NEPA) environmental assessment (EA), and Federal Energy Regulatory Commission (FERC) license amendment application for the proposed District's Silver Lake Dam Replacement Project (Project) as described in this combined Request for Qualifications (RFQ) / Request for Proposals (RFP). The El Dorado Irrigation District reserves the right to waive informalities or technicalities in proposals. The purpose of this RFQ/RFP is to identify firms that meet the qualification threshold defined herein and provides the highest value proposal to prepare an EIR, EA, and FERC license amendment application for the Project The scope of work for the professional services being solicited is found in Exhibit A attached to this RFQ/RFP. The successful proposal(s) will demonstrate sufficient staff resources, expertise, relevant experience, and lack of disabling professional conflicts to perform the scope of work, along with demonstrated commitment to cost-control and client service that meet the District's needs. Project components include; o Removal of the existing Dam, spillway, and appurtenances o Construction of the replacement Dam, spillway, and appurtenances o Combined replacement gravity dam and spillway structure, including labyrinth weir, stilling basin, wing dikes on the left and right abutments, and low level outlets o Spillway access and bridge o Cutoff wall o Grading and bank stabilization o Kit Carson Road improvements o Relocation and establishment of utilities The Project construction period is anticipated to be 18 months and is scheduled to begin in of February 2027 when Silver Lake levels are normally at their annual minimum. Question Deadline 01/28/2025 at 3:00 PM PT Any questions regarding information within this RFQ/RFP shall be submitted in writing via email to Doug Venable at dvenable@eid.org. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
179
Bidding Soon
1,894
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2027

Project location map

CA-88 & Carson Pass Hwy, Jackson, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.