Site work for a civil project in Wernersville, Pennsylvania. Completed plans call for site work for a water / sewer project.

The Work to be performed for the project includes supplying all labor, equipment, and materials for the replacement and relocation of an exposed sanitary sewer line due to erosion of the Spring Creek stream bank. The existing line will be abandoned in place, approximately 429 linear feet of 15-inch PVC sewer pipe will be installed, and two existing manholes will be replaced with precast concrete manholes. Temporary construction measures will include the installation of a rock construction entrance, wetlands matting, and other erosion and sedimentation controls to minimize environmental impact during the work. Additional alternate work may include trench reinforcement between the pipe and Spring Creek for stability. A non-mandatory Pre-Bid Meeting will be scheduled at a later date. Bidders assume responsibility that their Bid is received prior to the designated bid opening time and date. Each Proposal for the Project shall be accompanied by a Bid Security in the form provided by the Contract Documents, drawn to the order of the Robesonia Municipal Authority, and in an amount not less than ten percent (10%) of the extended Bid Amount, as a guarantee that if the Proposal is accepted, a Contract will be entered into and the performance thereby properly secured. The Robesonia Municipal Authority, Owner, hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, to waive any informality in bids received, and to accept the Bid, which is in the best interest of the Authority, consistent with the laws affecting municipal contract awards. Question Deadline 1/31/2025 at 4:00 PM ET Online Portal Proposed Work Sequence is as follows: 1. Mobilization and site preparation to include clearing and grubbing of the site, E&S Controls, trenching, and installation of wetlands matting (see Attachment A - General Permit). 2. Set-up bypass pumping around the section of piping to be abandoned within the Creek. 3. Cut and cap the existing sanitary sewer pipe in the Creek utilizing flowable fill and remove two (2) existing manholes. 4. Install two (2) new, precast concrete manholes to replace the existing manholes, including manhole encapsulation system installation. 5. Install new 15" diameter PVC Sanitary Sewer line and new precast manhole within the trench. Alternate - installation of trench reinforcement between the pipe and the Creek. 6. Remove bypass pumping controls and make new sewer line active. 7. Site restoration and final cleanup.

Award

Water / Sewer

$141,231.00

Public - City

Site Work

8

22

5

5

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
152
Bidding Soon
2,180
All Active Projects
986
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

April 2, 2025

img_map_placeholder

Wooltown Rd, Wernersville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Interceptor Relocation Run 15-16

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.