BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2025 at 7:00 PM

Updated February 13, 2025

Site work for a road / highway in Simi Valley, California. Completed plans call for site work for a road / highway.

As described in the Bidding Documents, the bids are for a public works project, Alamo Street and Tapo Street Signal Modification ("Project"), which consists of general traffic signal work at the intersection of Alamo Street and Tapo Street, which includes: 1) removing traffic signal poles and equipment; 2) installing new traffic signal poles, foundations and appurtenances; 3) removing and installing traffic signal wiring and cables; 4) installing and programming new traffic signal controller; and 5) installing and removing new video detection camera system. The First Notice to Proceed is defined as the notice given for acquisition of the parts and equipment necessary to carry out the work. The Second Notice to Proceed is defined as the notice given, following successful acquisition of the parts and equipment necessary to carry out the work, to proceed with construction. The expected completion time of the Project is 90 consecutive calendar days after receipt of the Second Notice to Proceed. LIQUIDATED DAMAGES: $500/day. Each Bid will be accompanied by Bid Security, in the amount of 10% of the Lump Sum Base Bid as security for Bidder's obligation to enter into a Contract with the City on the terms stated in the Bid Form and to furnish all items required by the Bidding Documents. Bid Security will be a Bid Bond on the form provided by the City or a certified check made payable to "City of Simi Valley." When a Bond is used for Bid Security, failure to use the City's Bid Bond form will result in the rejection of the Bid. All contacts should be through Justin Link, Principal Engineer, at (805) 583-6884 or jlink@simivalley.org regarding any bidding questions before or after the Notice to Proceed has been issued to the successful bidder. Five percent (5%) will be deducted from each progress payment and retained by the City.

Bid Results

Roads / Highways

$198,150.00

Public - City

Site Work

4

9

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

Project location map

Alamo St & Tapo St, Simi Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.