BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work, new construction and renovation of a transportation facility in Sebring, Florida. Completed plans call for the renovation of a 1,328-square-foot transportation facility; for the construction of a 725-square-foot transportation facility; and for site work for a transportation facility.

**As of March 19, 2025, project was awarded to E.O Koch Construction, Co, awarded amount is $243,982.80. Sealed bids, subject to the conditions herein, will be received for furnishing all labor and materials and performing all work connected with following program: Building 104, Hangar C2 Interior Improvements This project is a renovation of an existing tenant space in commercial hangar building #104 at Sebring Regional Airport. The total renovation area is approximately 2,053 SF. This consists of the following parts: 1.) Renovating approx. 1,328 SF of existing office/showroom, workshop space, and storage space, including an all new HVAC system. 2.) Creating 725 SF of new Workshop including an all new HVAC system, in a portion of the existing ventilated-only hangar bay. Interior walls will be demolished to make a larger Office/Showroom and a larger Storage Room. New partition walls, a new door and new finishes including new acoustical ceiling tiles will be added. A new Coffee Bar with new casework, minifridge, dishwasher, sink, and associated plumbing will be added adjacent the Office/Showroom. The new Workshop will have new walls and storefront windows, all new finishes, and a protective plywood cap over new light gauge framing that supports an insulated ceiling. Contractor must provide shop drawings signed and sealed by a structural engineer for the new framing, as well as to verify the capacity of the existing cap to support the new HVAC system overhead. New walls adjacent the hangar bay and new ceiling cap shall also be insulated and protected against moisture intrusion with a fully sealed liquid-applied barrier. New basic electrical is to be provided for the new and renovated spaces, consisting of a new 100A panel for standard light fixtures, HVAC, and convenience outlets. All existing ceiling light fixtures are to be replaced with new similarly sized LED fixtures. FF&E will be owner furnished / owner installed. A site visit of the construction site will be scheduled immediately following the Pre-Bid Conference. It will be the responsibility of the contractor to provide transportation for this site visit. No other tours or visits of the project site will be scheduled. Guarantee will be required with each bid as a certified check on a solvent bank or a bid bond in the amount of five (5) percent of the total amount of the bid, made payable to the Sebring Airport Authority. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price. AWARD/ACCEPTANCE: SAA reserves the right to accept or reject any or all Proposals, or any parts thereof, and the award, if an award is made, will be made to contractor determined to be responsible in accordance with Owners procurement and purchasing guidelines, and applicable Florida Statutes. SAA reserves the right to waive irregularities in the Proposal. Additional information for evaluation and criteria for selection are provided within the Instructions-to-Bidders. Bids may be held by the Sebring Airport Authority for a period not to exceed 120 days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. By submitting a bid, each Bidder agrees that the bid shall remain valid for at least 120 days from the date of the bid opening. The Sebring Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises and airport concession disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Proposers shall address any question regarding this ITB by submitting a question in writing (via email - entitle subject line "Building 104, Hangar C2 Bid #25-01, Question") to the Owner's Consultant stated in the Notice to Bidders. Do not contact the Owner via phone. Questions must be received Questions shall not constitute formal protest of the technical requirements or of the solicitation.

Award

Transportation Terminals

$243,983.00

Public - City

New Construction, Renovation, Site Work

27

18

16

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
158
Bidding Soon
2,399
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

March 24, 2025

Project location map

442 Hendricks Fld Wy, Sebring, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.