Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Site work for a civil project in Sebring, Florida. Completed plans call for site work for a water / sewer project.

Question Deadline 12/19/2024 Questions must be received Owner shall not be bound by any verbal information or by any written information that is not either contained within the solicitation documents or formally noticed and issued by Owner. Questions shall not constitute formal protest of the technical requirements or of the solicitation Sebring Airport Authority (hereafter referred to as SAA), Highlands County, Sebring, Florida, requests proposals for clearing-excavation of the center of airport perimeter drainage canal and the clearing of vegetation along the eastern, top of bank. The project for Airport Perimeter Canal Maintenance Clearing Segment 3 for SAA is located on the west side of the airport along Webster Turn Drive. The work efforts as detailed within the construction plans will include: The project begins in the channel section north of Gate 8A canal crossing and continues downstream to the south edge of the West Pond. The maintenance clearing work effort involves removal of vegetation, trees, soil, muck, and debris from the bottom of the channel section for a total length of 1,445-feet. Existing drainage structures that discharge into the canal are to be protected. The width of the channel section varies along the project length. The canal currently has heavy vegetation and soil deposits within the center. Tree growth is along the canal slopes with spoil banks along the top of the canal. The excavated material from the channel section will be removed from the western side of the canal and hauled to either of the two stockpile locations at the ends of the canal clearing project. Means and method or the need to dewater is to be determined by the contractor. In addition, bid alternates include vegetation clearing along the eastern, top of bank that is to be completed as detailed in the construction plans. This work effort is to achieve a clean appearance along the eastern edge of the airport perimeter canal. Smaller vegetation is to be removed, and large, significant trees will remain and be protected. These tasks are defined as Bid Alternative 1 for the southern segment and Bid Alternative 2 for the northern segment. Bid Alternative 3 includes two segments of ditch that will have sedimentation removed. The 200-ft ditch segment south of Gate 8A that was previously maintained requires cleaning out of recent sediment that has accumulated and a 90-ft ditch segment along Ulmann Drive has sediment to be removed. uarantee will be required with each bid as a certified check on a solvent bank or a bid bond in the amount of five (5) percent of the total amount of the bid, made payable to the Sebring Airport Authority. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price.

Award

Water / Sewer

$139,290.00

Public - City

Site Work

11

3

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
397
Active Projects
199
Bidding Soon
2,364
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

March 4, 2025

Project location map

Webster Turn Dr, Sebring, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.