BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work and paving for a mixed-use development in Holly Springs, North Carolina. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of November 6, 2025, this project is in the design phase. Construction is expected to begin in 2029 and last for 3 years. *Previous solicitation listed below for reference:* The Town of Holly Springs is soliciting proposals for the services of a firm/team for the following contract scope of work: The project consists of approximately 0.75 miles of road widening from Ralph Stevens Rd. to Cass Holt Rd. to a consistent 4-lane median divided cross-section with sidewalks, intersection improvements and utility upgrades. Proposed Contract Time: 24 Months The Department maintains on file the qualifications and key personnel for each approved discipline, as well as any required samples of work. Each year on the anniversary date of the company, the firm shall renew their prequalified disciplines. If your firm has not renewed its application as required by your anniversary date or if your firm is not currently prequalified, please submit an application to the Department prior to submittal of your LOI All correspondence and questions concerning this RFLOI should be directed to Tim Athy at 919-577- 3128, tim.athy@hollyspringsnc.gov. Questions may be submitted electronically only, to the contact above. Responses will be issued in the form of an addendum available to all interested parties. Interested parties should also send a request, by email only, to the person listed above to be placed on a public correspondence list to ensure future updates regarding the RFLOI or other project information can be conveyed. Questions must be submitted to the person listed above no later than April 18, 2025. The last addendum will be issued no later than April 25, 2025. NCDOT - RFP Engineering - Avent Ferry Rd. Widening - Ralph Stevens Rd. to Cass Holt Rd

Design

Roads / Highways

$7,300,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
2
Bidding Soon
1,359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2029

Project location map

Avent Ferry Rd, Holly Springs, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.