BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2025 at 8:00 PM

Updated March 26, 2025

Site work for a civil project in Holly Springs, North Carolina. Conceptual plans call for site work for a water / sewer project.

Question submissions must be received by 2:00 pm (ET) on Tuesday, March 18, 2025. Rachel Jones, Utility Engineer, Rachel.jones@hollyspringsnc.gov Holly Springs is a global biomanufacturing hub located in Wake County, NC, the third fastest growing county in the country. Located approximately 10 miles from Raleigh and Research Triangle Park, minutes from RTP airport and three tier one research universities, Holly Springs boasts an ecosyste encompassing infrastructure, diverse talent, affordability, and quality of life. The Town of Holly Springs is seeking a qualified NC licensed professional engineering firm to provide the services listed below for the Business Park Pump Station and Force Main Upgrades. The successful firm will provide the following services:There is an existing 16-inch force main, and the pump station currently has two (2) wet wells. One (1) active wet well houses two (2) pumps which convey the permitted capacity of 1,740 GPM at 154 TDH. Upgrades will place the inactive wet well and two (2) new pumps into service, increasing overall pump station capacity to 4,050 GPM, and include construction of a parallel 16-inch force main. Pump Station improvements include, but are not limited to, electrical components, instrumentation and control, andother associated mechanical equipment and appurtenances. To request a digital copy of the Construction Drawings for this project, please contact in writing: Rachel Jones, Utility Engineer, rachel.jones@hollyspringsnc.gov Construction Administration and Inspection Pre-construction meeting Part-time construction administration and inspection services Review, track, and approve the Contractor's equipment submittals and shop drawings for compliance with Construction Documents. Material testing, daily reports, etc. Utility relocations with private and public entities Weekly or bi-weekly construction meetings (combination of virtual and in-person); monthly onsite, meeting minutes, and progress reports Assist Town staff with door hangers, social media, HOA notifications, etc. Punchlist and project closeout As-built survey and record drawings Process, submit, and track all necessary public utility post-construction certifications required by the Town and the State.

Conceptual

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
143
Bidding Soon
1,695
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

Project location map

Multiple Locations, Holly Springs, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.