BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated February 17, 2026

Site work, paving and outdoor lighting for a mixed-use development in Holly Springs, North Carolina. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

Question Deadline 01/30/2026 at 4:00 PM ET Respondents shall submit all questions, in writing, to the contacts e-mail address listed below. Questions submitted via telephone will not be answered. Question Contact Information Chelsea Davis, Project Engineer chelsea.davis@hollyspringsnc.gov Thomas Gull, Park and Greenway Planner thomas.gull@hollyspringsnc.gov The Town has a 10% M/W/SBE participation goal for this project. Project budget The total project budget not to exceed is $1,075,000; inclusive of all costs associated with the design, construction, and installation. July 2026 Project Construction Start The scope of the desired park improvements includes the addition of two new regulation-sized basketball courts with amenities and the replacement of eight baseball dugouts. Project site: Parrish Womble Park is located at 300 Stinson Avenue in Holly Springs, North Carolina, adjacent to the Hunt Recreation Center. The park can be accessed from both Stinson Avenue to the north and Grigsby Avenue to the south. Current amenities of the 46-acre park include two synthetic turf soccer fields, tennis and pickleballs courts, picnic shelters, four lighted baseball/softball fields, playground, amphitheater band shell, greenway trails, horseshoe pits, and sand volleyball courts, and a concession and picnic area. Project budget: The total project budget not to exceed is $1,075,000; inclusive of all costs associated with the design, construction, and installation. The Town has a 10% M/W/SBE participation goal for this project. The design-build team must be properly licensed in NC and qualified to perform the work outlined in this solicitation and shall provide complete design, construction drawings for permit & construction, labor, materials, transportation, equipment, and all other items necessary to complete the project. The firm selected is expected to adhere to all federal, state, and local requirements. Major components include: Design and construct two new outdoor asphalt basketball courts, including fences, benches, lighting, and ADA compliant walkways to the parking area. Plan and perform the removal and replacement of eight (8) concrete-walled baseball dugouts with new modern aluminum chain-link dugout structures and separate storage areas. October 2026 Project Substantial Completion/Punchlist Inspection August 2026 Dugouts Replacement Complete prior to Fall Season

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,075,000.00

Public - City

Outdoor Lighting, Paving, Site Work

3

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2026

July 1, 2026

Project location map

300 Stinson Ave, Holly Springs, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.