BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 6, 2025

Site work for a water / sewer project in Rockport, Massachusetts. Completed plans call for site work for a water / sewer project.

The work of this contract includes all labor, material and equipment necessary to perform the work as indicated on the contract documents and as specified herein including but not limited to 1. The Contractor to provide the necessary furnishing of all labor, supervision, survey, materials, tools, and equipment,temporary facilities, such as portable sanitary facilities,temporary fencing, erosion control, cover on excavation material, and all other incidental work necessary to complete the work as shown on the Contract Drawings, and as herein specified. 2. The Contractor will have to perform the work in a manner that considers the tide cycle. 3. Procurement, delivery, and installations necessary for maintenance repairs to the Bradley Wharf structure including chinking wall face voids, upper stone reconstruction, capstone shimming, concrete apron reconstruction, and restoration of the topside of the wharf. Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner, or its advisor, and shall then become a part of the Contract Documents. The proposed Project consists of maintenance repairs to the Bradley Wharf structure including chinking wall face voids, upper stone reconstruction, capstone shimming, concrete apron reconstruction, and restoration of the topside of the wharf. All bids for this project are subject to applicable public bidding laws of Massachusetts, including G.L. c.30 Section 39M as amended. Bids Bradley Wharf Repair Project The proposed Project consists of maintenance repairs to the Bradley Wharf structure including chinking wall face voids, upper stone reconstruction, capstone shimming, concrete apron reconstruction, and restoration of the topside of the wharf. All bids for this project are subject to applicable public bidding laws of Massachusetts, including G.L. c.30 Section 39M as amended. The successful bidder must furnish a labor and materials payment bond in an amount equal to 100 percent of the total contract price. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price. The Town will reject general bids when required to do so in accordance with Massachusetts General Laws. The Town reserves the right to waive any informality, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.

Post-Bid

Water / Sewer

$292,500.00

Public - City

Site Work

9

11

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
214
Bidding Soon
3,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 7, 2025

Project location map

0 Bearskin Neck, Rockport, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.