Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000285438 D3. SCOPE OF SERVICES D3.1 The Services required under this Contract shall consist of professional consulting services for a comprehensive ASHRAE level 2 energy audit at six (6) City of Winnipeg buildings in accordance with the following: (a) The consultant shall conduct energy audits in accordance with the ASHRAE Level 2 standard, as specified in the ASHRAE 211-2018 guidelines. (b) The audits will focus on identifying opportunities to reduce energy consumption, lower utility costs, and address existing peak electricity usage, while also exploring strategies to transition to low-carbon energy sources. (c) Further to D3.1, the consultant team must conduct a minimum of one (1) site investigation in order to accurately assess and document observations of existing conditions; (d) The six (6) City of Winnipeg buildings which are part of the RFP No. 1097-2024 include the following sites with applicable addresses: (i) Pan Am Pool (15,149 m2) 25 Poseidon Bay (ii) WPS Police Headquarters (79, 679 m2) 245 Smith Street (iii) Confederation Building (7,202 m2) 457 Main Street (iv) Turtle Island Neighbourhood Centre (1,187 m2) 510 King Street (v) Animal Services (2, 318 m2) 1057 Logan Avenue (vi) Civic Centre Complex (19, 235 m2) 510 Main Street (e) Consulting team personnel will be required to obtain and maintain Security Clearances as identified in Part E, for the duration of the assignment; (f) A final draft copy of the complete detailed audit report is to be submitted for review and feedback to the Contract Administrator and City of Winnipeg team personnel prior to the final deliverable. D3.1.1 The Services required under D3 shall be in accordance with the City’s Project Management Manual http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#2 and templates http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being engaged by the City for their professional expertise; the Consultant shall bring to the Consulting Contract Administrator’s attention any aspect of the City’s Project Management Manual or templates which the Consultant is of the opinion is not consistent with good industry practice. D3.2 ENERGY AUDITS (a)Buildings represent one of the largest sources of greenhouse gas (GHG) emissions inWinnipeg, accounting for 44.4 percent of community-wide emissions in 2022. At thecorporate level, City facilities accounted for 34 percent of overall energy use and 21percent of emissions. Most building emissions at the community-wide and corporatelevels come from the use of natural gas for heating purposes. (b)OurWinnipeg 2045 sets out the City’s climate target of net zero emissions by 2050 whichaligns with federal and international targets. The Community Energy InvestmentRoadmap (CEIR) identifies City and community-wide systems level actions andinvestments to achieve this updated target. CEIR identifies that, after reducing the needfor energy and increasing energy efficiency, electrification of buildings is key to meetingour climate targets. Council directed the Public Service to implement CEIR in July 2022. (c)The main objectives of the Energy audits are to: (i)Reduce energy consumption in the listed buildings through various measures,including building envelope improvements and equipment upgrades. (ii)Lower building utility costs. (iii)Decrease peak electricity demand (iv)Develop strategies for transitioning to low-carbon energy sources, with aspecific focus on moving from fossil fuels to electricity in Manitoba. (d)The ASHRAE Level 2 energy audit shall include, but is not limited to the following: (i)Facility description including, schedules, energy sources and comfort or healthconcerns including indoor environmental quality (IEQ) deficiencies. (ii)Descriptive information for the following components, but not limited to: (iii)Building envelope (iv)Overall enclosure tightness (v)HVAC (vi)Domestic hot water (vii)Lighting (interior and exterior) (viii)Plug loads (ix)Monthly and annual utility data; a minimum of 12 months is required, howeverideally 2-3 years of data should be analyzed. (x)Utility rate information (xi)Annual Energy Use Intensity and Energy Cost Index (xii)Energy End-Use Breakdown (xiii)Benchmarking against similar facilities. (xiv)Identify potential capital EEM recommendations, including: •Estimated implementation cost. •Approximate measure lifespan. •Life Cycle Cost Analysis (LCCA) which measures total cost of ownershipover the lifecycle of the retrofit, including installation, operation,maintenance, and disposal costs. (xv)The financial analysis should incorporate a 2% annual escalation for electricityand natural gas prices. The carbon tax should increase until it reaches$170/tonne of CO2 in 2030, after which a 2% yearly escalation should beapplied. (xvi)Potential energy and carbon reduction incentives and grants from organizationssuch as Efficiency Manitoba and the Green Municipal Fund etc. (e)Efficiency Manitoba offer financial incentives and technical support for building ownersthat complete ASHRAE Level 2 or 3 audits for eligible commercial buildings:https://efficiencymb.ca/business/commercial-energy-audit-program/. Where possible,please take advantage of the Efficiency Energy Audit Program, however, please note thatthe energy auditor has to be a pre-qualified Consultant and the application must be approved prior to on-site assessment work. (f) The City will provide a minimum of 1 year, up to 3 years of energy, demand and cost data along with the Manitoba Hydro rate each facility falls under to the selected consultant. It is understood that currently, electricity costs more than natural gas. The City acknowledges that transitioning to electricity may result in increased utility costs, however, the City is keen on exploring electrification options that leverage a coefficient of performance (COP) higher than 1 for applicable applications. (g) Before and/or during the building walkthroughs, the consultant team shall create a draft layout for the energy audit report, outlining the contents of each section. This draft to be reviewed and approved by the City of Winnipeg project team. Comprehensive or Commercial General Liability Insurance including: (i) an inclusive limit of not less than $2,000,000 for each occurrence or accident with a minimum $2,000,000 Products and Completed Operations aggregate and $5,000,000 general aggregate; (ii) all sums which the Consultant shall become legally obligated to pay for damages because of bodily injury (including death at any time resulting therefrom) sustained by any person or persons or because of damage to or destruction of property caused by an occurrence or accident arising out of or related to the Services or any operations carried on in connection with this Contract; (iii) coverage for Products/Completed Operations, Blanket Contractual, Consultant's Protective, Personal Injury, Contingent Employer's Liability, Broad Form Property Damage, Employees as Additional Insureds, and Non-Owned Automobile Liability; (iv) a Cross Liability clause and/or Severability of Interest clause providing that the inclusion of more than one Insured shall not in any way affect the rights of any other Insured hereunder in respect to any claim, demand, suit or judgment made against any other Insured. D3.4 Total funds available for this Contract are $150,000.00 (MRST included, GST extra). Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
29
Bidding Soon
309
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

img_map_placeholder

Multiple Locations, Winnipeg, MB