BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Demolition, site work and addition to a day care center in Condon, Oregon. Completed plans call for the addition of a day care center; for the demolition of a day care center; and for site work for a day care center.

Project: 2022-048 The work to be performed shall consist of providing all materials, labor, and equipment necessary: 1. Selective demolition of existing building. 2. Construction of new addition for childcare and alteration to existing building. 3. Associated site work and exterior improvements 4. Work includes CSI divisions, 2, 3, 4, 5, 6, 7, 8, 9, 10, 12, 22, 23, 26, 27, 28 31 32, & 33 The engineer's construction cost opinion for this project is: $2,670,000. Condon Early Learning Center may reject any bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all bids upon a finding of Condon Early Learning Center it is in the public interest to do so. Condon Early Learning Center also reserves the right to waive any informality in connection with said bid or to postpone the award of the Contract for ninety days. Attention is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. No bid will be received or considered by Condon Early Learning Center unless the Bidder is registered with the Construction Contractors Board or licensed by the State Landscape Contractors Board as required by ORS 671.530. No bid may be withdrawn after the time set for the bid opening nor before the award of the Contract, unless award is delayed for a period exceeding sixty days or as per the instructions to bidders. Question Deadline 01/31/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Bid Results

Day Care Centers

$2,452,160.00

Public - City

Addition, Demolition, Site Work

49

26

35

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
17
Bidding Soon
218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

April 24, 2025

Project location map

311 E Bayard St, Condon, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.